To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

White Rock Wind Farm

From Wikipedia, the free encyclopedia

White Rock Wind Farm
Map
CountryAustralia
LocationGlen Innes, New South Wales
Coordinates29°47′S 151°32′E / 29.79°S 151.54°E / -29.79; 151.54
StatusOperational
Construction beganMay 2016
Commission dateAugust 2017
Construction costA$450m (Stage 1 & 2) (2011 dollars)
Owner(s)Goldwind Australia
Wind farm
TypeOnshore
Hub height89.5 metres (294 ft)
Rotor diameter121 metres (397 ft)
Power generation
Units operational70 × 2.5 MW
Make and modelGoldwind 121
Nameplate capacity175 MW
Capacity factor33.27% (average 2018-2021)
Annual net output510.0 GWh (average 2018-2021)
External links
Websitehttps://whiterockwindfarm.com/

White Rock Wind Farm is a wind farm in the Australian state of New South Wales. It is in the New England region of northern New South Wales, 40 kilometres (25 mi) east of Inverell and 20 kilometres (12 mi) west of Glen Innes. It is south of the Gwydir Highway. The Sapphire Wind Farm is north of the highway and Glen Innes Wind Farm is south of the highway closer to Glen Innes.[1] It is approved for up to 119 wind turbines, and stage 1 has been completed with 70 turbines.[2] In 2011 it had an estimated construction cost of A$450m.[3]

YouTube Encyclopedic

  • 1/4
    Views:
    427
    606
    1 895
    337
  • Ausreo Case Study - Gullen Range Wind Farm Crookwell NSW
  • Tour of a Wyoming Wind Farm, Part 1 of 3.
  • The construction of Ormonde wind farm - Vattenfall
  • Sunset and Wind Turbines. DJI Forum Contest. Dodge Center MN Spark Bing Err

Transcription

Operations

The wind farm began increasing output grid power in July 2017, was fully commissioned in February 2018 and has operated since then. The generation table uses eljmkt nemlog to obtain generation values for each month.

White Rock Wind Farm Generation (MWh)
Year Total Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2017 80,622 N/A N/A N/A N/A N/A N/A 1,563* 15,204* 10,029* 17,452* 18,473* 17,901*
2018 520,686 30,826* 47,075* 51,720 47,184 39,874 46,462 43,343 49,259 40,780 40,160 39,692* 44,311
2019 525,373 30,786 56,922 44,355 50,959 43,413 44,342 49,503 37,389 45,090 34,497 42,634 45,483
2020 501,095 33,449 43,159 54,146 29,951 44,302 36,758 45,327 51,724 48,544 32,179 32,371 49,185
2021 492,988 43,138 45,912 47,525 38,168 30,667 41,479 49,611 36,052 30,623 43,138 48,021 38,654

Note: Asterisk indicates power output was limited during the month.

References

  1. ^ "Sapphire Wind Farm Map" (PDF). CWP Renewables. Retrieved 13 September 2019.
  2. ^ "White Rock Wind Farm". White Rock Wind Farm. Goldwind. Retrieved 14 September 2019.
  3. ^ "White Rock WindFarm Environmental Assessment" (PDF). Retrieved 30 October 2020.
This page was last edited on 11 January 2022, at 20:41
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.