To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Mount Piper Power Station

From Wikipedia, the free encyclopedia

Mount Piper Power Station
Map
CountryAustralia
LocationNew South Wales
Coordinates33°21′32″S 150°1′56″E / 33.35889°S 150.03222°E / -33.35889; 150.03222
StatusOperational
Commission date1993
Owner(s)EnergyAustralia
Thermal power station
Primary fuelCoal
Turbine technologySteam turbine
Power generation
Units operational2 × 700 megawatts (940,000 hp)
Make and modelTokyo Shibaura Electric (Japan)
Nameplate capacity1,400 MW
Capacity factor56.60% (average 2017-2021)
Annual net output6,941 GW·h (average 2017-2021)
External links
CommonsRelated media on Commons

Mount Piper Power Station is a coal powered power station with two steam turbines with a combined generating capacity of 1,400 MW of electricity. It is located near Portland, in the Central West of New South Wales, Australia and owned by EnergyAustralia, a subsidiary of CLP Group. On 23 September 2021, it was announced that the closure of the power station is being brought forward from 2042 to 2040 at the latest. The power station employs 250 workers.[1]

YouTube Encyclopedic

  • 1/5
    Views:
    4 039
    10 963 431
    670 716
    3 824 118
    222 230
  • Wallerawang Power Station Short Film
  • The Most Reckless Pilots. Lowest Flights You've Never Seen Before
  • Best Wall Chaser | Concrete Grooving Machine | Wall Cutting Power Tools
  • The US Build Powerful Bomber The World Is Afraid Of
  • Hydraulic Power Pack - how it works

Transcription

Construction

The first generator (Unit 2) was completed in 1992, and the second (Unit 1) in 1993. Units 3 and 4, although planned, were not built. It was the last power station built by the Electricity Commission of New South Wales (a body since abolished). Much of the design work done was undertaken in-house by the commission.

In 2009 Delta Electricity (the government owned enterprise that previously owned and managed the power station as a commercial entity) unofficially re-rated the units at Mount Piper from their original 660MW to 700MW.[2]

In 2007 & early 2008 there was public talk of 'completing' the power station by using modern super-critical, dry-cooling tower, coal-fired units of up to 1000MW capacity which uses much less water from surrounding rivers.[3]

On 7 April 2010 the New South Wales Department of Planning announced that approval had been given to Delta Electricity to 'complete' the station by installing 2000MW of new generating capacity.[4]

Technical

Mount Piper draws its cooling water from Lyell Dam and Thomsons Creek Dam, both purpose-built for the station. Lyell Dam is located on the Coxs River 20 kilometres (12 mi) away. Large pumps draw water from the dam and transfer it to a pipeline built between Thompsons Creek Dam and Mount Piper. The power station taking what water it needs and the excess flowing into Thompsons Creek Dam. When no pumps are in service the water supply to the power station is gravity fed from Thompsons Creek Dam.

Carbon Monitoring for Action estimates this power station emits 9.08 million tonnes of greenhouse gases each year as a result of burning coal.[5] The National Pollutant Inventory[6] provides details of other pollutant emissions, but, as at 23 November 2008, not CO2.

Operations

Yearly generation (MWh) by unit
Year Total MP1 MP2
2011 10,242,151 5,163,830[7] 5,078,321[8]
2012 8,776,593 3,942,534[9] 4,834,059[10]
2013 9,854,146 5,340,532[11] 4,513,614[12]
2014 8,239,950 4,187,273[13] 4,052,677[14]
2015 5,467,455 2,796,720[15] 2,670,735[16]
2016 7,749,257 3,372,276[17] 4,376,981[18]
2017 7,344,075 4,189,078[19] 3,154,997[20]
2018 8,715,653 3,835,639[21] 4,880,014[22]
2019 4,691,506 2,423,968[23] 2,267,538[24]
2020 6,769,304 3,005,181[25] 3,764,123[26]
2021 7,185,315 3,870,977[27] 3,314,338[28]

See also

References

  1. ^ Toscano, Nick; Foley, Mike (23 September 2021). "EnergyAustralia to close NSW coal power plant early". The Age.
  2. ^ "Mt Piper Power Station Extension Environmental Assessment" (PDF).
  3. ^ "Mt Piper Power Station Extension".
  4. ^ Hall, Louise (7 April 2010). "Approved: power plant with emissions equal to 2.9m cars". The Sydney Morning Herald.
  5. ^ "Carbon Monitoring for Action". Retrieved 23 November 2008.
  6. ^ "National Pollutant Inventory".
  7. ^ Nem Log[permanent dead link]
  8. ^ Nem Log[permanent dead link]
  9. ^ Nem Log[permanent dead link]
  10. ^ Nem Log[permanent dead link]
  11. ^ Nem Log[permanent dead link]
  12. ^ Nem Log[permanent dead link]
  13. ^ Nem Log[permanent dead link]
  14. ^ Nem Log[permanent dead link]
  15. ^ Nem Log[permanent dead link]
  16. ^ Nem Log[permanent dead link]
  17. ^ Nem Log[permanent dead link]
  18. ^ Nem Log[permanent dead link]
  19. ^ Nem Log[permanent dead link]
  20. ^ Nem Log[permanent dead link]
  21. ^ Nem Log[permanent dead link]
  22. ^ Nem Log[permanent dead link]
  23. ^ Nem Log[permanent dead link]
  24. ^ Nem Log[permanent dead link]
  25. ^ Nem Log[permanent dead link]
  26. ^ Nem Log[permanent dead link]
  27. ^ Nem Log[permanent dead link]
  28. ^ Nem Log[permanent dead link]

External links

This page was last edited on 7 June 2023, at 06:15
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.