To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Walkaway Wind Farm

From Wikipedia, the free encyclopedia

Alinta 'Walkaway' Wind Farm
Map
Official nameAlinta Wind Farm
CountryAustralia
LocationWalkaway, Western Australia
Coordinates28°53′53″S 114°52′7″E / 28.89806°S 114.86861°E / -28.89806; 114.86861
StatusOperational
Construction beganLate 2004
Commission dateJanuary 2006
Owner(s)Infigen Energy
Operator(s)Infigen Energy
Wind farm
TypeOnshore
Hub height80 metres
Rotor diameter82 metres
Power generation
Units operational54
Make and modelVestas NM82
Nameplate capacity89.1 MW
External links
Websitewww.infigenenergy.com

Alinta wind farm (also known as Walkaway wind farm) is a wind power station at Walkaway, just south of Geraldton, Western Australia.[1] It is owned by Infigen Energy and has offtake agreements with Alinta Energy and AGL Energy.[2]

The Alinta wind farm has an installed capacity of 89.1 megawatts. It supplies Perth and the south west in the South West Interconnected System (SWIS).

Each year the wind farm generates energy that would normally produce 360,150 tonnes of greenhouse gases if generated by fossil fuel based methods. This is the equivalent of removing 76,000 cars from the roads.[1]

Electricity produced by the wind farm is purchased mainly by Alinta Energy.[3]

In June 2022, one of the turbines collapsed, causing the wind farm to be temporarily shut down.[4]

YouTube Encyclopedic

  • 1/3
    Views:
    389
    9 042
    980
  • Collgar Wind Farm ( Merredin )
  • PT 1 OF 3 GERALDTON WESTERN AUSTRALIA WA
  • GREENOUGH RIVER MOUTH

Transcription

See also

References

  1. ^ a b Major WA Initiatives.sedo.energy.wa.gov.au Archived 2007-06-12 at the Wayback Machine
  2. ^ "Alinta Wind Farm". Infigen Energy. Retrieved 30 August 2019.
  3. ^ Renewable Energy Production
  4. ^ Vorrath, Sophie (16 June 2022). "Wind turbine collapses in "serious event" at WA wind farm". Renew Economy. Retrieved 3 July 2022.

External links

This page was last edited on 16 November 2023, at 09:13
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.