To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Limondale Solar Farm

From Wikipedia, the free encyclopedia

Limondale Solar Farm
Map
CountryAustralia
LocationBalranald, New South Wales
Coordinates34°47′S 143°30′E / 34.79°S 143.50°E / -34.79; 143.50
StatusCommissioned
Construction beganOctober 2018
Commission date2021; 3 years ago (2021)
Owner(s)RWE
Operator(s)Belectric (subsidiary of Innogy)
Solar farm
TypeFlat-panel PV
Collectors872,000
Site area900 ha (2,200 acres)
Power generation
Nameplate capacity313MW AC (349MW DC)
External links
Websiteiam.innogy.com/en/about-innogy/innogy-innovation-technology/renewables/solar-energy/limondale-solar-plant

Limondale Solar Farm is a solar farm south of Balranald in southwestern New South Wales, Australia. When it was completed, it was the largest solar farm in Australia. It is owned by German company RWE through a subsidiary Belectric Solar and Battery, and was constructed by Australian engineering company Downer Group.[1][2]

The Limondale site was identified and the initial proposal was developed by Overland Sun Farming. The site is adjacent to a Transgrid 220kV substation. The development received planning consent from the New South Wales government on 1 September 2017.[3] Innogy was initially brought in as a financial partner, but then it acquired ownership in September 2018, prior to construction.[4] Construction began in October 2018, and was completed in 2020.[5]

Immediately south of the Limondale solar farm, the Sunraysia Solar Farm is also under construction.[6]

YouTube Encyclopedic

  • 1/1
    Views:
    1 101
  • Sunraysia Solar Farm in Balranald, NSW

Transcription

See also

References

  1. ^ Parkinson, Giles (18 October 2018). "Downer wins contract to build Australia's biggest solar farm". RenewEconomy. Retrieved 16 February 2019.
  2. ^ "Downer to build Australia's largest solar farm". Downer Group. 18 October 2018. Retrieved 16 February 2019.
  3. ^ "Limondale Sun Farm". Overland Sun Farming. Retrieved 16 February 2019.
  4. ^ Bloch, Michael (27 September 2018). "Limondale Solar Farm Construction To Start In October". SolarQuotes Blog. Retrieved 16 February 2019.
  5. ^ Maisch, Marija (18 October 2018). "Downer to build Australia's largest solar farm". PV Magazine. Retrieved 16 February 2019.
  6. ^ Galletta, Simon; Tribe, Matt (10 October 2018). "Two of Australia's biggest solar farms set for NSW, as market operator looks at how to manage power grid". ABC Mildura-Swan Hill. Retrieved 16 February 2019.
This page was last edited on 11 April 2024, at 11:45
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.