To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Kennedy Energy Park

From Wikipedia, the free encyclopedia

Kennedy Energy Park
Map
Country
  • Australia
Coordinates21°S 145°E / 21°S 145°E / -21; 145
StatusOperational
Construction began2018
Commission date2023
Owner(s)Windlab
Solar farm
TypeFlat-panel PV
Wind farm
TypeOnshore
Site usageFarm Land
Rotor diameter
  • 136 m (446 ft)
Power generation
Units planned12 × 3.45 MW
Nameplate capacity50 MW
External links
Websitekennedyenergypark.com.au

Kennedy Energy Park is a wind, solar and storage hybrid power station approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.

Stage one of the project is a “proof-of-concept” commenced construction 2018, consisting of 30 MW of wind turbines, 20 MW of single axis tracking Solar Panels, and 2 MW of Li ion battery storage, costing $120 million to build was commissioned in 2023.[1] It was constructed in 2018 but did not start to connect to the grid until July 2021.[2] It is intended that the combination of solar and wind generation will be complementary and lead to stable output.[3]

Stage two is proposed to be capable of producing 1200 MW of renewable energy, costing $2 billion and was hoped to commence construction before the end of 2020.[4]

See also

References

  1. ^ "50MW Wind, Solar and Storage hybrid facility approved". Kennedy Energy Park. Retrieved 28 July 2016.
  2. ^ Parkinson, Giles (8 July 2021). ""World first" wind, solar and battery project finally starts production after 3-year wait". Renew Economy. Retrieved 11 November 2021.
  3. ^ "Renewable energy providing near baseload generation". Kennedy Energy Park. Retrieved 11 November 2021.
  4. ^ "$120m outback Queensland hybrid renewable energy farm gets stage one approval". ABC. Retrieved 28 July 2016.


This page was last edited on 1 February 2024, at 00:22
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.