To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Lake Bonney Wind Farm

From Wikipedia, the free encyclopedia

Lake Bonney Wind Farm
Early morning at Lake Bonney wind farm
Map
CountryAustralia
LocationMillicent, South Australia
Coordinates37°45′36″S 140°24′0″E / 37.76000°S 140.40000°E / -37.76000; 140.40000
StatusOperational
Commission dateMarch 2005 (2005-03)
Construction costA$700 million
Owner(s)Infigen Energy
Wind farm
TypeOnshore
Power generation
Units operational112
Make and modelVestas
Nameplate capacity278.5 MW
Capacity factor34%
Storage capacity52 MW·h
External links
Websitewww.infigenenergy.com/lake-bonney/
CommonsRelated media on Commons

Lake Bonney Wind Farm is a wind farm near Millicent, South Australia, Australia. The wind farm is south of, and contiguous with, Canunda Wind Farm. Both are built along the Woakwine Range - a line of stabilised sand dunes that once were coastal.

The project was built in three stages. Stage 1 comprises 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 comprises 53 turbines of 3 MW (total 159 MW). Stage 3 comprises 13 turbines of 3 MW of total 39 MW).[1] Stage 3 construction commenced in February 2009 and was commissioned in September 2009.[2]

The owner of the Lake Bonney Wind Farm is Infigen Energy, previously known as Babcock and Brown Wind Partners. Wind turbines are serviced under a post-warranty service agreement[3] by the turbine manufacturer Vestas.

YouTube Encyclopedic

  • 1/3
    Views:
    609
    903
    429
  • Lake Bonney Barmera SA (drone footage)
  • Cape Jervis Wind Farm
  • Wind farm, Australia 2

Transcription

Battery storage

It was announced in August 2018 that a battery storage power station would be added to the wind farm to provide firmer commitments to provide electricity, system security and ancillary services to the electricity grid. The project would cost A$38 million to install, including $5 million from the government of South Australia and $5 million from the Australian Renewable Energy Agency (ARENA). The battery is rated at 25 MW and 52 MW·h, and is connected to the Mayurra substation.[4] Like the similar Hornsdale Power Reserve, the battery will operate independently of the wind farm in the electricity market, and connect to the grid at the same point as the wind farm.[5] Construction of the battery was completed in May 2019,[6] and testing began in November 2019.[7] In 2020, its Frequency Control Ancillary Service (FCAS) earned $230,000 per MWh installed.[8]

See also

References

  1. ^ Wind power and wind farms in South Australia: Wind in the Bush
  2. ^ "Lake Bonney Wind Farm Stage 3". www.aurecongroup.com. Retrieved 5 September 2021.
  3. ^ "INFIGEN EXECUTES POST-WARRANTY SERVICES AGREEMENTS WITH VESTAS" (PDF). Archived from the original (PDF) on 2 June 2012. Retrieved 22 January 2016.
  4. ^ Washington, David (15 August 2018). "Another big battery to be built in SA". InDaily. Retrieved 15 August 2018.
  5. ^ Moret, Glen (15 November 2018). "South Australia's $38 million Tesla battery site on track to charge in 2019, giving Infigen more opportunities". ABC South East SA. Retrieved 25 January 2019.
  6. ^ "Lake Bonney Battery Energy Storage System". Infigen Energy. Retrieved 30 August 2019.
  7. ^ Parkinson, Giles (5 November 2019). "Lake Bonney battery charges up for first time in South Australia". RenewEconomy.
  8. ^ Parkinson, Giles (23 February 2021). "Dalrymple big battery delivers biggest bang for megawatt hour of storage". RenewEconomy.

External links

This page was last edited on 15 February 2023, at 14:21
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.