To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Lower Jurala Hydro Electric Project

From Wikipedia, the free encyclopedia

Lower Jurala Hydro Electric Project
Location of Lower Jurala Hydro Electric Project in Telangana
Lower Jurala Hydro Electric Project (India)
Official nameLower Jurala Hydro Electric Project
LocationMulamalla Village, Jogulamba Gadwal district, Telangana
Coordinates16°18′47″N 77°46′38″E / 16.31306°N 77.77722°E / 16.31306; 77.77722
PurposePower
StatusUnder construction
Construction began13 November 2008
Construction costEst Rs.1474.83 Crores
Dam and spillways
ImpoundsKrishna River
Lower Jurala Hydro Electric Project
Operator(s)TSGENCO
Commission dateUnit-1 29 December 2013
[1]

Unit-2 10 January 2014
Unit-3 28 July 2016
Unit-4 28 July 2016
Unit-5 September 2016

Unit-6 September 2016
TypeRun-of-the-river
Turbines6 x 40 MW (54,000 hp)Bulb type [2]
Installed capacity240 MW (320,000 hp)
Website
http://tsgenco.telangana.gov.in/

Lower Jurala Hydro Electric Project is a major on-going Hydro Electric Project near Mulamalla Village, Atmakur Mandal, Jogulamba Gadwal district, Telangana. The project construction was started in 2008, planned to completed it by 2014. But due to the delay it may completed by end of 2015. There will be 6 units, each can produce 40 MW power. The first unit was synchronized in December 2013 and the second unit was synchronized in January 2014 and connected to the grid.

Due to the quality issues in gates, along with units 1&2,unit-3 nearing erection completion and assemblies in various stages were inundated on 30 July 2014 late night flood water released from Jurala Project.

Units 3 and 4 were commissioned and declared of commercial operation of 40 MW each unit on 28 July 2016 confirmed by Mr. Venkata Rajam, COD Hydel, Telangana State Genco.

See also

References

  1. ^ "Telangana - Projects under construction". Telangana Power Generation Corporation. Archived from the original on 2 April 2015. Retrieved 1 September 2014.
  2. ^ "Projects under Execution - Lower Jurala, India". Alstom technologies. Retrieved 1 September 2014.

External links


This page was last edited on 23 September 2023, at 02:27
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.