To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Yadadri Thermal Power Plant

From Wikipedia, the free encyclopedia

Yadadri Thermal Power Plant
Map
Official nameYadadri TPS
CountryIndia
LocationDameracherla, Nalgonda district, Telangana
Coordinates16°42′25″N 79°34′44″E / 16.7069°N 79.579°E / 16.7069; 79.579
StatusUnder construction
Construction beganOctober 2017
Construction cost₹25,099 Crores
(USD $3.8 billion)
Owner(s)TSGENCO
Operator(s)TSGENCO
Thermal power station
Primary fuelCoal
Power generation
Nameplate capacity4000 MW
External links
Websitewww.tsgenco.co.in

Yadadri Thermal Power Plant is an upcoming 4000 megawatt, supercritical thermal power project coming up at Dameracherla, Nalgonda district in Telangana, India. The project is second largest in South India, at a cost of ₹25,099 crores (US$3.8 billion) and is expected to complete by October 2021 in a phased manner. The state-owned Telangana State Power Generation Corporation Limited (TSGENCO) is building the 5 x 800 mega thermal power station, built on 2800 acres near Veerlapalem Village in Nalgonda District, the second mega project announced by the Telangana government after Bhadradri Thermal Power Plant.

YouTube Encyclopedic

  • 1/1
    Views:
    26 737
  • NTPC- National Thermal Power Corporation Recruitment –NTPC jobs by GATE, Exam dates & results

Transcription

NTPC recruitment notification then hello all this is Nilima from Freshersworld.com jobs and careers today and bringing them into words invention apply for the NDP ended with a limited formerly known by the name of national almond bar Corporation Limited is the Government of India undertaking responsible for generation of electricity and allowed activities founded in the year 1975 and awarded the time I got nothing to lose by the government and DBZ is dank a commendable 424 in the fall global 2000 the prospect of working for this fall is suddenly the dream of many indians all that and hence and too busy jobs are one of the most sought often once and defensive medically offers job to wear his graduate students at a graduate engineer it nation instrumentation of training very small watching opportunities are suddenly want to treasure and to be the recruitment drive consists of a comment preliminary examination which culminates with a group discussion and interview this tank at all and for all the engineering graduates the need to appear in the gate examination to get their hands on the prestigious and DBZ Joe the end too busy recruitment 2015 is primarily for dole what time do we can see is as engineering executive trainee aspirants who have been avoided a graduation degree in the following streams of acte approved are you just say the government is doing what city are deemed it was the day only electrical of Electrical and Electronics bar systems and hiv-1 don't Bartlett John looks part engineering mechanical production industrial engineering collection at industrial engineering tyrell are mechanical and automation electronics and instrumentation instrumentation and control Electronics and Telecommunication all electronics and bout pilot John X Electronics and Communication are Electrical and Electronics after getting gaped applicants who have cleared the required gotta mocks ago I have to the fourth quarter the discussion at bosnian you down the NDP's the job vacancy did are as follows: total vacancies on 120 division of a concert but definitely electrical are forty mechanical 16 electronics then and instrumentation dead the age limit is twenty-seven years for any candidate and angel expression is allow only according the specified rules and a minimum of six to fight both and aggregate in the mud during the course of a degree that up in gaza meticulous process then every aspect like got meditate and gold %uh are considered the interviews are conducted by the best of it are managers and officials the selection process to is hence a very challenging one for the aspirants but certainly %uh the boarding 12 the end to basic idea is something which is often by and that's also love every year and a few selected lot I had the opportunity to like in the very short span of time missiles and acting and looking good like-minded people make the experience even better the grasp of ER particular stream and also an interest in engineering is that a must in order to shine at and OBC every candidate stream destination for all the latest news and results in the 100 jobs should be measures wind up call it is the one stop solution to every day did aboard the latest job offerings results and job that does this is one side binge everyone should certainly bookmark apart from this even though officials side of and 2 B's the is very informative and can be handy for but we should walk may even be back a bit more said jobs so stay connected ass thank you on that bro

History

Chief Minister of Telangana, K. Chandrashekar Rao laid the foundation stone for the project on 8 June 2015 at Veerlapalem village, Dhamacherla mandal. The name was rechristened from Damaracharla Thermal Power Plant as Yadadri.

The Project

The BHEL order, the largest ever in India for the company,[1] includes design, supply, erection and commissioning of project on EPC basis. The project completion is executed on fast track basis within 36 months for first two units and balance three units in 48 months from October 2017.[2][3] This is the biggest project executed by BHEL.[4]

Clearances

The project has been accorded environmental clearance by the Ministry of Environment, Forest and Climate Change (MoEF&CC)in June 2017 [5] and yet to get water allocation from the Krishna River.[6]

MoEF granted Environment clearance to this thermal power plant on June 29, 2017.[7] LOI issued to BHEL with zero date 17 October 2017. The revised environment norms at the center, the 4000 MW project will cost Telangana an additional ₹3100 crore. The new environment norms mandate setting-up of flue-gas desulfurization (FGD) devices.

Capacity

The planned capacity of the thermal power plant is 4000 MW (5 x 800 MW)

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I Unit I 800MW 31 Dec 2023 work commenced [8]
Stage I Unit II 800 MW 31 Dec 2023 work commenced
Stage II Unit III 800 MW 30 June 2024 work commenced
Stage II Unit IV 800 MW 30 June 2024 work commenced
Stage II Unit V 800 MW 30 June 2024 work commenced

References

  1. ^ "BHEL bags India's largest power contract worth Rs 20,400 crore from Telangana - ET EnergyWorld". ETEnergyworld.com. Retrieved 1 January 2019.
  2. ^ "BHEL starts execution of Rs 20,400 crore Yadadri thermal power plant in Telangana". Financialexpress.com. 23 October 2017. Retrieved 1 January 2019.
  3. ^ "BHEL Bags its Largest Order Worth Rs 18,000 Crore in Telangana". NDTV.com. Retrieved 1 January 2019.
  4. ^ "BHEL Gets Its Largest Order Yet: 4K MW Plant at Yadadri". The New Indian Express. Retrieved 1 January 2019.
  5. ^ Chandrashekhar, B. (4 July 2017). "Work on Yadadri thermal project to begin soon". Thehindu.com. Retrieved 1 January 2019.
  6. ^ V, Swathi (29 December 2015). "MoEF defers approval to Yadadri power project". Thehindu.com. Retrieved 1 January 2019.
  7. ^ "Letter from Indian Government Offices to Project's chief Engineer granting environmental clearance" (PDF). Environmentalclearance.nic.in. Retrieved 27 January 2019.
  8. ^ "Bharat Heavy Electricals Ltd". Bhel.com. Retrieved 1 January 2019.


This page was last edited on 12 May 2024, at 14:35
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.