To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Fruitridge station

From Wikipedia, the free encyclopedia

Fruitridge
Sacramento RT Light Rail
General information
LocationFruitridge Road at 28th Avenue
Sacramento, California
United States
Coordinates38°31′32.18″N 121°28′48.41″W / 38.5256056°N 121.4801139°W / 38.5256056; -121.4801139
Owned bySacramento Regional Transit District
Platforms1 side platform, 1 island platform
Tracks2
ConnectionsBus transport Sacramento Regional Transit: 61, SmaRT Ride Franklin−South Sacramento[1]
Construction
Structure typeAt-grade
AccessibleYes
History
OpenedSeptember 26, 2003 (2003-09-26)[2]
Services
Preceding station Sacramento Regional Transit District Following station
City College
toward Watt/I-80
Blue Line 47th Avenue
Location
Map

Fruitridge station is an at-grade light rail station on the Blue Line of the Sacramento RT Light Rail system operated by the Sacramento Regional Transit District. The station is located in an exclusive right-of-way alongside the Union Pacific Railroad's Sacramento Subdivision at its intersection with Fruitridge Road, after which the station is named, in the city of Sacramento, California. The station serves the commercial areas along Fruitridge Road and the residential neighborhoods of Hollywood Park and South City Farms.

Platforms and tracks

Fruitridge station has a slightly different design compared to other stations built as part of the Blue Line Southwest Extension. Passengers use an island platform to board trains, but the station also has a small side platform integrated into a plaza on the west side of the station that also contains the westbound bus stop and a crosswalk to the eastbound bus stop. The southbound tracks are embedded in the pavement, allowing passengers to cross to the island platform from any point in the plaza. The layout is both efficient and a cost-effective way of providing a pedestrian-train-bus interface.[3]

Freight tracks UP Sacramento Subdivision; No passenger service →
Northbound      Blue Line toward Watt/I-80 (City College)
Island platform, doors open on the left
Southbound      Blue Line toward Cosumnes River College (47th Avenue)
Short side platform, one car length
Plaza Buses

References

  1. ^ "SacRT System Map" (PDF) (Map). Sacramento Regional Transit District. August 29, 2021. Retrieved July 16, 2022.
  2. ^ Bizjak, Tony (September 27, 2003). "New vista for light rail – 1st new line in 16 years opens to fanfare". The Sacramento Bee. p. A1.
  3. ^ Light Rail Progress (September 2003). "Sacramento Light Rail: South Line Opens on Time, on Budget". Light Rail Now! website. Retrieved February 5, 2010.


This page was last edited on 7 March 2024, at 19:10
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.