To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Sacramento Subdivision

From Wikipedia, the free encyclopedia

Canyon Subdivision enlarge…
Oroville Yard
Valley Subdivision
Marysville
Natomas/Sacramento Airport
Old North Sacramento
Sacramento RT Light Rail
Sacramento
closed
1970
Midtown Sacramento
(Sacramento RT Light Rail)
Broadway
4th Avenue/Wayne Hultgren
City College
Sacramento RT Light Rail
Fruitridge
47th Avenue
Florin
Meadowview
Morrison Creek
Elk Grove
planned
New Hope
Lodi
planned
ACE maintenance facility

The Sacramento Subdivision is a rail line owned and operated by the Union Pacific Railroad in the U.S. state of California. The line begins in Marysville as a continuation of the Canyon Subdivision at a junction with the Valley Subdivision (the former Southern Pacific Railroad line), and travels south through the Central Valley to a junction with the Fresno Subdivision in Stockton.[1] South of Downtown Sacramento, the Sacramento RT Light Rail Blue Line runs adjacent to the right of way until a flyover near Consumnes River Boulevard. The route between Sacramento and Stockton hosts about 12 to 20 freight trains daily as of 2018.[2] Additionally, the Amtrak Coast Starlight runs over the tracks between Marysville and Sacramento.

The subdivision was formerly part of the Western Pacific Railroad Feather River Route. Passenger services along the line ceased with the cancellation of the original California Zephyr in 1970, but the Amtrak Coast Starlight was rerouted along the line starting in 1997 between Marysville and Sacramento. In the 2010s, demand had increased for more passenger services between Stockton and Sacramento, but the sole existing route along the Fresno Subdivision was deemed to be at-capacity without prohibitively expensive upgrades. This led to the parallel Sacramento Subdivision being selected to carry additional Amtrak San Joaquins and new Altamont Corridor Express commuter rail trains.[2][3]: 36  Six new stations were planned: three in Sacramento and one each near Lodi, Elk Grove, and Natomas. A proposed North Elk Grove station was eliminated from planning in September 2020.[4]

References

  1. ^ SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation.
  2. ^ a b Bizjak, Tony (October 4, 2017). "Catch an Amtrak toward L.A. from midtown Sacramento? Train officials propose new service". Sacramento Bee. Retrieved May 7, 2018.
  3. ^ "2020 Business Plan" (PDF). SJJPA. Retrieved May 16, 2020.
  4. ^ "Valley Rail Sacramento Extension Project Draft Environmental Impact Report" (PDF). Valley Rail Sacramento Extension Project Draft Environmental Impact Report Volume II. September 2020. Archived from the original (PDF) on May 25, 2021. Retrieved December 19, 2020.
KML is not from Wikidata


This page was last edited on 10 February 2024, at 23:05
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.