To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Traeth Mawr Loop

From Wikipedia, the free encyclopedia

Traeth Mawr Loop
Station on heritage railway
General information
LocationPorthmadog, Gwynedd
Wales
Coordinates52°56′24″N 4°06′45″W / 52.93998°N 4.11254°W / 52.93998; -4.11254
Grid referenceSH581401
Managed byWHR Ltd
Platforms0
History
Original companyCroesor Tramway
Key dates
23 March 2007Opened
28 October 2007Closed

Traeth Mawr Loop was a short-lived terminus during the restoration of the Welsh Highland Railway (WHR). The run-around loop was located within Traeth Mawr just the north of Porthmadog, Wales. It operated during 2007 before being replaced by the new mainline a year later.

Track laying to Traeth Mawr was completed by the Welsh Highland Railway by November 2006, making it the northern limit of the WHR from Porthmadog. The terminus, which had a run-around loop, opened to passengers services on 23 March 2007. Passengers were unable to board or alight at Traeth Mawr. The last public service was on 28 October 2007. Although WHR ran push-pull services to a point just south of Farmyard Farm Crossing, for some time afterwards.

After closure, the Traeth Mawr loop was removed in order to construct the WHR's new main line building southwards. On 31 August 2008, the final length of track from Caernarfon was laid at the location of the former loop.[1] The line from Pen-y-mount to Traeth Mawr was removed from operational service at the end of the 2008 season.

In 2009 construction of the Welsh Highland Railway from Caernarfon was continued through this stretch with Subscribers' trains from Caernarfon passing through the site of the loop in autumn 2009, and again through to Porthmadog Harbour on 31 October 2010. Regular passenger trains on the completed line through the former site of the Traeth Mawr Loop re-commenced from Porthmadog Harbour on 4 January 2011.

Preceding station
Heritage Railways
  Heritage railways
Following station
Pont Croesor   Welsh Highland Railway   Pen-y-Mount station

YouTube Encyclopedic

  • 1/3
    Views:
    552
    371
    871
  • A ride South of Pont Croesor Level Crossing Part 2.WHR.
  • Riding with Isibutu
  • Statfold Barn Railway,Steam,Traction,2014

Transcription

References

Notes

  1. ^ "WHR Project Phase 4 - Pont Croesor to Traeth Mawr". Retrieved 6 May 2011.

Sources

This page was last edited on 20 September 2023, at 12:40
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.