To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Puri–Durg Express

From Wikipedia, the free encyclopedia

Puri–Durg Express
Overview
Service typeExpress
First service2006
Current operator(s)East Coast Railway zone
Route
TerminiDurg Junction (DURG)
Puri (PURI)
Stops18
Distance travelled797 km (495 mi)
Average journey time17h 10m
Service frequencyDaily [a]
Train number(s)18425/18426
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board catering
E-catering
Observation facilitiesLHB coach
Entertainment facilitiesNo
Baggage facilitiesNo
Technical
Rolling stock2
Track gauge1,676 mm (5 ft 6 in)
Operating speed46 km/h (29 mph), including halts

The Puri–Durg Express is an Express train belonging to East Coast Railway zone that runs between Durg Junction and Puri in India. It is currently being operated with 18425/18426 train numbers on a daily basis.[1][2][3] This train was introduced as Bhubaneswar–Raipur express in 2006. In 2010 it was extended to Puri and Durg.

Service

  • The 18425/Puri–Durg Express has an average speed of 46 km/h and covers 797 km in 17h 10m.
  • The 18426/Durg–Puri Express has an average speed of 47 km/h and covers 797 km in 17h.

Route and halts

The important halts of the train are:

Coach composition

The train has standard LHB rakes with a max speed of 110 kmph. The train consists of 20 coaches:

  • 1 First AC
  • 2 AC II Tier
  • 2 AC III Tier
  • 8 Sleeper coaches
  • 5 General Unreserved
  • 2 Seating cum Luggage Rake

Traction

Both trains are hauled by a Visakhapatnam Loco Shed-based WAP-4 electric locomotive from Durg to Titlagarh Junction. From Titlagarh Junction, trains are hauled by a Raipur Loco Shed-based WDP-4D diesel locomotive up to Puri.

Direction reversal

The train reverses its direction 2 times:

See also

Notes

  1. ^ Runs seven day in a week for every direction.

References

External links


This page was last edited on 13 October 2023, at 19:16
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.