To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

East Coast Railway zone

From Wikipedia, the free encyclopedia

East Coast Railway
15-East Coast Railway
Overview
HeadquartersBhubaneswar
LocaleOdisha
Chhattisgarh
Andhra Pradesh
Dates of operationApril 1, 2003; 20 years ago (2003-04-01)
PredecessorSouth Eastern Railway Zone
Technical
Track gauge5 ft 6 in (1,676 mm)
Electrification25 kV 50 Hz AC
Other
Websiteeastcoastrail.indianrailways.gov.in

The East Coast Railway (abbreviated ECoR) is one of the 19 railway zones of Indian Railways. It came into existence on 1 April 2003. The headquarters of the zone are at Bhubaneswar, Odisha

YouTube Encyclopedic

  • 1/5
    Views:
    23 346
    579
    1 948
    2 316
    3 773
  • East Coast Railway zone of indian railway
  • East Coast Railway(Bhubaneshwar)||Railway group d||total application||per seat compitition
  • RTI REPLY, EAST COAST RAILWAY, KHURDA DIVISION
  • East Coast Railway Apprentice 2022 | East Coast Railway Recruitment 2022 How To Apply | Telugu Job
  • East coast railway zone || meeting with MANORANJAN SIR || Brmgss new update

Transcription

History

Consequent upon the parliament's approval, East Coast Railway was the first of the seven new zones to be inaugurated by the then Prime Minister of India H. D. Deve Gowda on 8 August 1996. The Officer-on-Special Duty took over charge of the newly declared Zone on 16 September 1996. Initially, only one division namely Khurda Road was attached to this railway.

Subsequently, the zone became fully operational on 1 April 2003. The Waltair division was notified to be bifurcated from the East Coast Railway zone on 27 February 2019. The Odisha section of Waltair division will constitute the new Rayagada division, while the Andhra Pradesh section will be a part of the South Coast Railway zone upon operationalization.[1]

Divisions

The geographical jurisdiction of East Coast Railway zone extends over three states encompassing almost all of Odisha and Bastar, Mahasamund and Dantewada districts of Chhattisgarh and a minor part [Palasa, Sompeta and seven other stations] of Srikakulam district in Andhra Pradesh. The zonal headquarters is at Bhubaneswar in Odisha.

The zone has three divisions: Sambalpur, Khurda Road and Waltair.

The Rayagada railway division has been proposed to succeed a section of the existing Waltair division which will remain in the East Coast Railway zone upon bifurcation.[2]

Electrification

As of 31 December 2021, it is one of the three 100% electric railway zones in India.[3] The East Coast Railway line integrated with the commissioned Howrah-Chennai electrified trunk route on 29 November 2005. There was a missing link between Kharagpur and Visakhapatnam stations and all trains from Howrah towards Chennai side had to undergo a locomotive change from electric to diesel at Kharagpur and vice versa at Visakhapatnam in order to pass through Odisha. Even trains from New Delhi such as the Bhubaneswar Rajdhani had to undergo the change at Kharagpur. This frequent loco change on a trunk route became a time-consuming and inconvenient process. With electrification along the 765 km Kharagpur-Visakhapatnam stretch, trains got speeded up and the need for double headed diesels for high speed express trains was eliminated thus saving on diesel consumption and a cleaner travel. Additionally the line branching off Khurda road towards Puri was also electrified. Gradually the Cuttack-Angul line, Cuttack-Paradeep line and branch line from Jakhapura towards Barbil got electrified too.

Major railway stations

The major railway stations in the entire zone are Bhubaneswar, Cuttack, Chatrapur, Puri, Sambalpur, Khurda Road, Balugaon, Rayagada, Brahmapur, Angul, Dhenkanal, Bhadrak, Balangir,Bargarh,Jajpur Keonjhar Road, Titilagarh,Kesinga, Lanjigarh, Koraput, Mahasamund, Jagdalpur, Kendujhargarh, Palasa and Barbil.

Most of the major stations fall in the state of Odisha, Chhattisgarh.

Gallery

Rail infrastructure

Routes

East Coast Railway zone has about 273 railway stations with a track length of 5214 km spread as follows:-

Division Total kilometre Electrified kilometre
Track Route Track Route -
Total 5,214 2,677 3,371 1,543

Railway lines

ECoR zone has below tracks. All are 5 ft 6 in (1,676 mm) broad gauge. The sections are:-

  1. Bhadrak-Bhubaneswar-Khurda Road- Double Electrified BG line [92 Railway stations]
  2. Talcher-Cuttack Double Electrified BG line [21 Railway stations]
  1. Titlagarh Junction-Mahasamund Single Electrified BG line [15 Railway stations] (Electric doubling of this line is currently underway)
  2. Cuttack-Paradip Double Electrified BG line [10 Railway stations]
  3. Khurda road-Puri Double Electrified BG line [11 Railway stations]
  4. Sambalpur Junction-Talcher Single Electrified BG line [16 Railway stations](Electric doubling of this line is currently underway)
  5. Titlagarh Junction-Sambalpur Junction Single Electrified BG line [16 Railway stations] (Electric doubling of this line is currently underway)
  6. Sambalpur Junction-Jharsuguda Junction Double Electrified BG line [10 Railway stations]
  7. Rayagada-Koraput Single Electric BG line [15 Railway stations]
  8. Naupada Junction-Gunupur Single Diesel BG line [14 Railway stations]
  9. Jakhapura Junction-Banspani Single Electrified BG line [17 Railway stations] (Electric doubling of this line is currently underway)

Loco sheds

External links

See also

References

  1. ^ "QUOTE ON ESTABLISHMENT OF SOUTH COAST RAILWAY _ RAILWAYS CLARIFIES". eastcoastrail.indianrailways.gov.in. 28 September 2022.
  2. ^ "Delays dog new railway zone". The Hindu. 27 December 2021. Retrieved 9 May 2022.
  3. ^ "Major Leap towards 100% Electrification: 3 Railway Zones of Indian Railways, i.e, West Central Railway, Kolkata Metro and East Coast Railway have been fully electrified, reducing carbon footprints". Twitter.com. Retrieved 3 February 2022.
This page was last edited on 2 June 2023, at 08:04
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.