To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Narkatiaganj–Bhikhna Thori branch line

From Wikipedia, the free encyclopedia

Narkatiaganj–Bhikhna Thori line
Overview
StatusOperational
OwnerIndian Railways
LocaleBihar
Termini
Service
Operator(s)East Central Railway
Technical
Line length36 km
Track gauge1,676 mm (5 ft 6 in) broad gauge
ElectrificationYes
Route map

km
36
Bhikhna Thori
23
Gawnaha
17
Bhitiharwa Ashram
13
Amolwa
0
Narkatiaganj Junction
Right arrow to Barauni
Left arrow to Gorakhpur
Down arrow

The Narkatiaganj–Bhikhna Thori line is a rail line in eastern India that connects Narkatiaganj and Bhikhna Thori near the Indo-Nepal border.

History

Railway lines in the area were pioneered by Tirhut Railway and the Bengal and North Western Railway lines in the 19th century. In his book The Indian Empire, Its People, History and Products W.W.Hunter says, "The Tirhut State Railway with its various branches intersects Northern Behar and is intended to extend to the Nepal frontier on one side and to Assam on the other."[1]

The area was laid with metre-gauge tracks. The 229 km (142 mi) Samastipur–Narkatiaganj loop was developed in stages between 1875 and 1907. The Samastipur–Darbhanga line opened for famine relief in 1874 and opened to the public on 1 November 1875. The 72 km (45 mi)-long Nirmali branch (Darbhanga–Nirmali) opened between 1883 and 1886. The Sakri–Jainagar branch opened in 1905. The Jhanjharpur–Laukaha Bazar line opened in 1976.[2]

Gauge conversion

Presently services are suspended on this 36 km line since 2015, as it is undergoing gauge conversion, from 1,000 mm (3 ft 3+38 in) metre gauge to 1,676 mm (5 ft 6 in) broad gauge. It is expected that the first stretch between Narkatiaganj Junction and Amolwa (13 km) to be completed in March 2020 and by June 2020, up to Gawnaha (23 km). The final section between Gawnaha and Bhikhna Thori (13 km) passes through dense forest and needs a special permit from the Forest Department allowing construction works. As of August 2019, the permit has not been given.[3] According to the forest department, Gawnaha–Bhikhna Thori section should be closed and the railway land transferred to them.[4]

References

  1. ^ W. W. Hunter (2005). The Indian Empire, Its People, History and Products. Asian Educational Services. ISBN 9788120615816. Retrieved 6 November 2012. {{cite book}}: |work= ignored (help)
  2. ^ "Indian Railways line history 2. North Eastern Railway" (PDF). Retrieved 6 November 2012.
  3. ^ "2022 तक पूरा होगा रेललाइन दोहरीकरण का कार्य: सीएओ" [Railway line doubling to be completed by 2022: CAO]. Jagran (in Hindi). Bettiah. 3 August 2019. Retrieved 14 January 2020.
  4. ^ "बंद हो सकता है गौनाहा भिखनाठोरी रेलखंड" [Gaunaha – Bhikhna Thori rail section may be closed]. Live Hindustan (in Hindi). Bagaha. 10 April 2019. Retrieved 14 January 2020.

External links

|

This page was last edited on 2 February 2024, at 09:40
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.