To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Programme for Rebuilding and Improving Existing Schools

From Wikipedia, the free encyclopedia

A school building at Aljunied, being constructed under PRIME.

Programme for Rebuilding and IMproving Existing schools (PRIME) is a programme initiated by the Ministry of Education in 1999 to upgrade and rebuild school buildings in Singapore.

YouTube Encyclopedic

  • 1/3
    Views:
    5 140
    1 273
    1 772
  • Raven Rock: The Story of the U.S. Government's Secret Plan to Save Itself
  • President Obama - September 12th, 2015 - video caption - A New College Scorecard
  • NYC Department of Housing Preservation and Development

Transcription

Flexible School Infrastructure (FlexSI)

Under this framework, school infrastructure is made more flexible to support teaching approaches that better engage students, thus giving schools more room to innovate in teaching and learning.

For example, the schools could have modular classrooms that can be opened up for larger group lectures, or partitioned for smaller group discussions; special-purpose rooms could be designed such that multiple usage of such rooms can be made possible; common areas such as corridors and study areas could be designed such that they can be expanded learning spaces.

Implementation

Phasing

Launched in May 1999, PRIME was estimated to cost S$4.5 billion and is implemented in phases. As of September 2007, 243 schools have been included in the earlier nine phases of PRIME. Of these, 207 schools have completed their upgrading.

On-site rebuilding and upgrading

Where feasible, a school will remain on-site while construction work is carried out for either upgrading or rebuilding. All construction works must be carried out outside school hours, such as between 7:00pm and 7:00am. It also has to consider noise levels between 10:30pm and 7:00am, since most of the schools are located in or around residential areas.

Otherwise it will move to a temporary holding site, known as filler school, while upgrading or rebuilding is carried out at its present site.

Relocation

Where a vacant site is available, the new school will be built on this site. The school will relocate to the new site once the school building is ready.

Mergers

To optimise the use of resources, schools may merge and be relocated. Such merger of schools may sometimes allow for a greater exchange of expertise and policies to provide a higher quality of education, as was the case of the merger of Ang Mo Kio North Primary School, Li Hua Primary School and Hong Dao Primary School. The three schools merged in January 2000 to be known as Anderson Primary School and was successfully validated through an External Validation, just one year after the merger, under the School Excellence Model.

References

  • "Eight More Schools to Benefit from Upgrading" (Press release). Ministry of Education (Singapore). 2007-02-14. Archived from the original on 2007-02-16. Retrieved 2007-02-14.

External links


This page was last edited on 9 January 2024, at 05:24
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.