To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Rantarata
Overview
Line numberA, E, I, L, P, U, X, Y
Termini
Stations28
Service
Route number1
History
Opened1902
Technical
Line length195.8 km (121.66 mi)
Number of tracksQuad (Helsinki–Leppävaara)
Double (Leppävaara–Kirkkonummi)
Single (Kirkkonummi–Turku)
Track gauge1,524 mm (5 ft)
Electrification25 kV @ 50 Hz
Operating speed120 to 200 km/h (75 to 124 mph)
Route map

Helsinki
Pasila
Ilmala
Huopalahti
Valimo
Mäkkylä
Pitäjänmäki
Leppävaara
Kilo
Kera
Kauniainen
Koivuhovi
Tuomarila
Espoo
Kauklahti
Masala
Jorvas
Tolsa
Kirkkonummi
Siuntio
Inkoo
Karjaa
enlarge… to Hanko
Salo
Kupittaa
to Tampere
Turku
Turku Harbour

Rantarata (the Coastal Railway, Swedish: Kustbanan), is a railway running between Helsinki Central Station and Turku Central Station in Finland. Its first segment, linking Turku to Karis, was commissioned in 1895, and work began the following year. The Turku–Karis track was opened for temporary traffic on 1 April 1899 and for permanent use on 1 November 1899. The second part of the Rantarata, linking Karis to Helsinki, was approved in 1897 and opened for traffic in 1902–1903.

The track was built to primarily serve commuter traffic and was therefore laid out with many curves and as few tunnels and expensive earthworks as possible. This resulted in a series of corrections and straightening of curves, a work which began in the 1910s and continued all the way to the 1990s.

As a part of the original plan, all of the stations along the Rantarata featured wooden station houses designed by the architect Bruno Granholm. Over the years many of these wood station building had been dismantled to make way for newer structures, such as Leppävaara railway station in 1999. Some of the old buildings still remain, Kauniainen railway station being the most significant example.

The track between Helsinki and Kirkkonummi was upgraded with 25 kV AC railway electrification during the 1960s, and was the first government-owned electrified railway line in Finland. Together with other improvements and maintenance, the Kirkkonummi–Karis track received its overhead lines in 1994. Coinciding with the purchase of VR Group's first VR Class Sm3 "Pendolino" high-speed trains, the remaining track between Karis and Turku Harbour was electrified in 1995, completing the route.

The passenger service to Uusikaupunki was abolished in the early 1990s, while freight traffic continues through the Port of Uusikaupunki. Work to electrify the line to Uusikaupunki was scheduled to begin in 2019, leading to the possibility of passenger service being reinstated.[1]

YouTube Encyclopedic

  • 1/2
    Views:
    6 053
    1 702
  • "LÄTTÄHATULLA" SALLASTA KEMIJÄRVELLE 2012
  • Ohjaamovideo Retretti-Lusto-Punkaharju

Transcription

References

  1. ^ "Turku–Uusikaupunki-radan sähköistys alkaa ensi vuonna – henkilöliikenne vauhtiin jälleen vuonna 2020?".

External links

Media related to Helsinki–Turku railway at Wikimedia Commons

This page was last edited on 3 November 2023, at 13:28
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.