To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Helsinki City Rail Loop

From Wikipedia, the free encyclopedia

Helsinki commuter trains would arrive under the city centre in tunnel, loop around, and return north again without terminating or reversing
Helsinki City Rail Loop
Pasila railway station
Alppila
(alternatives 2 & 3)
New tunnel portals
(alternative 1)
Hakaniemi metro station
Töölö
University of Helsinki metro station
Helsinki Central railway station
Rautatientori metro station
City Centre

The Helsinki City Rail Loop (Finnish: Pisararata literally translated: droplet railway, Swedish: Centrumslingan) is a planned new railway line in Helsinki, Southern Finland. It is to be a double track balloon loop in the shape of a tear drop. Helsinki commuter rail currently terminating at Helsinki Central railway station would be diverted into tunnels under the city centre. New underground stations would be created in Töölö (west), Helsinki city centre (south; likely to be located directly under Forum shopping centre) and Hakaniemi metro station (east), with a possible fourth station at Alppila (north) depending on how the connection to the main line is made in relation to the existing northern Pasila railway station.[1] The new tracks will be 7 kilometres (4 mi) long.[2]

The target is to free up capacity at Helsinki Central railway station to allow for expansion of long-distance trains; the existing capacity between Pasila and Helsinki has been all used up with the opening of the Ring Rail Line in 2014.[3] Detailed planning took place during 2012–2015, resulting in the project being shelved in February 2015.[4] The project was initially expected to cost €956 million if completed by the 2020s.[5] For the planning stages, €40 million was allocated.[6] By 2019 the expected cost of the original plan had risen to €1.5 billion.[7]

In June 2022, the Finnish Transport Infrastructure Agency (FTIA) published a report stating that the City Rail Loop is not necessary, and suggested alternatives such as renewal of commuter train fleets and improved railway signalling. Individual changes in gear and geometry are also needed in the railway area of the Central railway station and Pasila.[8] However, the study has looked at a situation in which the City Rail Loop, Lentorata, the new direct line between Riihimäki and Tampere and the Helsinki–Turku high-speed railway would have been implemented.[9]

YouTube Encyclopedic

  • 1/5
    Views:
    208 786
    124 216
    3 040
    1 563 951
    766
  • European Railway Project of the Century: Rail Baltica
  • A Game Changer for the World Trade: The Arctic Railway?
  • Morning rush hours at Helsinki Central Railway Station
  • Webcam Zürich HB
  • 2012 Utzon Lecture Series - "100th Anniversary of Walter Burley Griffin: Griffin and Canberra"

Transcription

See also

References

  1. ^ "City Rail Loop (Pisara-rata)". Finnish Transport Agency. Retrieved 26 April 2012.
  2. ^ "Kari Ruohonen". The Future of AirRail. also be linked to the City Rail Loop, a 7-km long underground railway line running under the Helsinki city centre. The railway design will begin in 2012 and a decision about its implementation can be made in 2014.[permanent dead link]
  3. ^ "Future projects". Pääkaupunkiseudun Junakalusto. Retrieved 26 April 2012.
  4. ^ "Cabinet cancels Helsinki rail loop plan". YLE News. 24 February 2015. Retrieved 30 December 2020.
  5. ^ "Pisararata". Liikennevirasto. Retrieved 3 March 2015.
  6. ^ "City Rail Loop general plan approved". City of Helsinki. 16 March 2012. Archived from the original on 13 February 2013. Retrieved 26 April 2012.
  7. ^ ""Antti Rinteen suunnitelma tulisi liian kalliiksi veronmaksajille" – Tiilikainen: Pisararata vanheni, tehdään Lentorata keskustaan asti". Uusi Suomi. 27 March 2019. Retrieved 25 April 2019.
  8. ^ "Helsinki–Pasila kapasiteettiselvitys" (PDF). Vayla. June 2022.
  9. ^ Valtanen, Tero (17 June 2022). "Yllätyskäänne: Helsingin alle suunniteltua jättimäistä junatunnelia "Pisararataa" ei välttämättä tarvitakaan". Yle. Retrieved 3 August 2022.

External links

This page was last edited on 11 June 2023, at 19:40
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.