To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Istanbul Waste Power Plant

From Wikipedia, the free encyclopedia

Istanbul Waste Power Plant
Map
Official nameİBB Atık Yakma ve Enerji Üretim Tesisi
CountryTurkey
LocationIşıklar Mah., Eyüp, Istanbul
Coordinates41°13′30″N 28°48′54″E / 41.22500°N 28.81500°E / 41.22500; 28.81500
StatusOperational
Construction began16 September 2017
Commission dateNovember 26, 2021; 2 years ago (2021-11-26)
Owner(s)Istanbul Metropolitan Municipality
Operator(s)İstanbul Environmental Management Co. (İSTAÇ)
Thermal capacity175 MW⋅h
Power generation
Nameplate capacity78 MW⋅h

Istanbul Waste Power Plant (Turkish: İBB Atık Yakma ve Enerji Ürestim Tesisi) is a waste-to-energy facility in the Eyüp district of Istanbul near the Odayeri landfill,[1] Turkey, using waste incineration. Opened in 2021 it is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ).[2] It is Turkey's first power plant of this type.[3] Project development started in 2011 with a grant from the United States Trade Development Agency (USTDA) which involved first a Definitional Mission and subsequently a detailed Feasibility Assessment.[4][5]

YouTube Encyclopedic

  • 1/3
    Views:
    6 663
    1 831
    2 341
  • The First Waste to Energy plant in the UAE
  • Explore inside Lakeside Energy from Waste
  • Turning Turkey’s coal mines into solar farms would power 7 million homes

Transcription

Overview

The waste-to-energy plant was built by a consortium of the Swiss Hitachi Zosen Inova and the Turkish Makyol. Construction began on 16 September 2017.[6][7] Located in the Işıklar (formerly Kısırmandıra) neighborhood of the Eyüp district of Istanbul,[8] it was opened on 26 November 2021.[2][6] The plant is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ), a subsidiary of the Metropolitan Municipality.[6] It is Turkey's first waste-to-energy facility.[3][6] Kömürcüoda on the Asia side also generates electricity.

Characteristics

The plant is capable of incinerating 3,000 tons of waste daily, 15% of Istanbul's daily domestic waste.[2][6] The three incinerators each of 1,000 tons capacity reach about 850–1,100 °C (1,560–2,010 °F).[7][8] It can generate 78 MW⋅h electrical energy and 175 MW⋅h thermal energy. The generated electricity is equivalent to the needs of nearly 1.4 million people. A reduction of greenhouse gas emissions amounting to 1.38 million tons can be achieved, which is the amount of exhaust gas emission of about 700.000 vehicles.[2][9] In 2022 the nearby Odayeri landfill was estimated by Climate Trace to have emitted over 6 million tonnes of CO2eq.[10] 90 people are employed in the facility. The plant saves a waste landfill storage area of 100 ha (250 acres).[7]

References

  1. ^ Todorović, Igor (2022-02-15). "Istanbul expands waste-to-energy capacity to cover electricity needs of two million people". Balkan Green Energy News. Retrieved 2023-05-21.
  2. ^ a b c d "Atık Yakma ve Enerji Üretim Tesisi" (in Turkish). İstanbul Büyükşehir Belediyesi – Atık Yönetimi Müdürlüğü. 18 June 2018. Retrieved 27 November 2021.
  3. ^ a b "Türkiye'nin ilk, Avrupa'nın en büyük atık yakma ve enerji üretim tesisi İstanbul'da hizmete girdi". NTV (in Turkish). 26 November 2021. Retrieved 28 November 2021.
  4. ^ "USTDA Grant List".
  5. ^ Serbetci, Walter I. (2018). "Feasibility Assessment and Project Development for 3,000 Mtons/Day Istanbul Waste-to-Energy Plant". Proceedings of the 19th Annual Electric Power Conference, Nashville, TN, 2018.
  6. ^ a b c d e "Türkiye'nin ilk, Avrupa'nın en büyük atık yakma ve enerji üretim tesisi İstanbul'da hizmete girdi". Habertürk (in Turkish). 26 November 2021. Retrieved 27 November 2021.
  7. ^ a b c "Türkiye'de ilk: 1,4 Milyon kişinin elektriği evsel atıklardan üretilecek". Cumhuriyet (in Turkish). 25 December 2020. Retrieved 28 November 2021.
  8. ^ a b "İstanbul Büyükşehir Belediuesi Atık Yakma ve Enerji Üretim resisi Projesi" (PDF) (in Turkish). İstanbul Büyükşehir Belediyesi – Atık Yönetimi Müdürlüğü. Retrieved 28 November 2021.
  9. ^ "İBB Atık Yakma ve Enerji Üretim Tesisi faaliyete geçti Kaynak: İBB Atık Yakma ve Enerji Üretim Tesisi faaliyete geçti". Enerji Günlüğü (in Turkish). 26 November 2021. Retrieved 28 November 2021.
  10. ^ "Comparison Tool - Climate TRACE". climatetrace.org. Retrieved 2023-12-05.
This page was last edited on 11 April 2024, at 03:23
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.