To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Arkun Dam
Location of Arkun Dam in Turkey
CountryTurkey
Locationİspir, Erzurum Province
Coordinates40°40′34.25″N 41°17′21.09″E / 40.6761806°N 41.2891917°E / 40.6761806; 41.2891917
PurposePower
StatusOperational
Construction began2011
Opening date2014
Owner(s)State Hydraulic Works
Dam and spillways
Type of damEmbankment, earth-fill
ImpoundsÇoruh River
Height (foundation)188 m (617 ft)
Height (thalweg)140 m (459 ft)
Dam volume6,774,345 m3 (8,860,509 cu yd)
Reservoir
Catchment area6,853 km2 (2,646 sq mi)
Power Station
Commission dateJune 2014
Hydraulic headDownstream: 225 m (738 ft) (gross)[1]
Toe: 225 m (738 ft) 121 m (397 ft) (nominal)[2]
TurbinesDownstream: 3 x 75 MW Francis-type
Toe: 2 x 5.96 MW Francis-type
Installed capacity236.92 MW
Annual generation788 GWh (estimate)

The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) (11.92 MW) and the other downstream (225 MW) in Artvin Province.[1][3]

YouTube Encyclopedic

  • 1/5
    Views:
    6 480
    2 747
    951
    1 453
    712
  • Ataturk Dam, Turkey Landscape - Before and After
  • Turkey-Hasankeyf Part 22
  • Concrete mixer truck lifted by Crane at Dam Construction site in Turkey
  • Construction of a Power House From Start to Finish. 1 Year of Difficult Reinforcement Work.
  • Solar Cooked Turkey Torpedo!!

Transcription

See also

References

  1. ^ a b Sucu, Sezai. "Çoruh Basin Projects" (PDF) (in Turkish). State Hydraulic Works. Archived from the original (PDF) on 22 February 2014. Retrieved 7 May 2013.
  2. ^ "Introductory File For Capacity Increase Within Arkun Dam and HEPP" (PDF). Dolsar. November 2010. Archived from the original (PDF) on 21 February 2014. Retrieved 7 May 2013.
  3. ^ "As arkun Dam and HEPP was completed in a short period of 4 years" (in Turkish). State Hydraulic Works. 18 June 2014. Retrieved 25 February 2016.


This page was last edited on 9 October 2023, at 22:53
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.