To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Cawnpore–Barabanki Railway

From Wikipedia, the free encyclopedia

Cawnpore–Barabanki Railway (1943-1953)
Cawnpore–Burhwal Railway (1894-1953)
IndustryRailways
Founded1894
Defunct27 February 1953
SuccessorNorth Eastern Railway
Headquarters
Cawnpore, United Provinces
,
Area served
Northern India
ServicesRail transport

Cawnpore–Barabanki Railway (C–B) (1943-1953) (earlier called Cawnpore–Burhwal Railway (1894-1943) was a railway in northern India. It was managed as part of the East Indian Railway, and was worked by the Bengal and North Western Railway and the Rohilkund and Kumaon Railway.

YouTube Encyclopedic

  • 1/1
    Views:
    824 724
  • History of Barabanki Uttar Pradesh | बाराबंकी का इतिहास | सभी पर्यटन स्थलों के साथ

Transcription

History

Cawnpore–Burhwal Railway was sanctioned for construction in October 1894 to provide a link between the metre gauge railways, north of the Ganga river with the Rajputana-Malwa Railway system. The construction was commenced in November 1894. The line was constructed alongside the broad gauge from Cawnpore via Lucknow to a junction with Bengal and North Western Railway at Burhwal 160 km away. The metre gauge line between Burhwal and Daliganj on the Lucknow–Bareilly Railway was opened on 24 November 1896. The line was later extended to Barabanki. The line was 29 km long.[1] The metre gauge Cawnpore-Aishbagh section of the Cawnpore–Burhwal Railway (metre gauge link) was opened for goods traffic on 25 April 1897. The line was 72 km long.[2]

In Oudh and Rohilkhand railway and Cawnpore–Burhwal railway there were no curves of a shorter radius than 1,000 feet (300 m), except on the Cawnpore–Burhwal railway where the sharpest curve has a radius of 573 feet (175 m).[3]

The Railway was essentially the common stem of the Bengal and North Western Railway and Rohilkund and Kumaon Railway networks. The Cawnpore–Burwhal Railway was renamed the Cawnpore–Barabanki Railway around 1943. The Cawnpore–Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.

Conversion to broad gauge

The CBR was converted to 1,676 mm (5 ft 6 in) broad gauge in 2014.[4]

References

  1. ^ Sitansu Sekhar Ghosh (2002). Railways in India--a legend: origin & development (1830–1980). Jogemaya Prokashani. p. 126. Retrieved 2 July 2013.
  2. ^ Lawrence Saunders, S. R. Blundstone (1897). The Railway Engineer. Vol. 18. p. 262. Retrieved 2 July 2013.
  3. ^ Great Britain. Parliament. House of Commons (1903). Papers by command. Vol. 47. HMSO. p. 373. Retrieved 2 July 2013.
  4. ^ MEMU train
This page was last edited on 18 March 2023, at 18:13
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.