To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Line 9 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

Line 9
Line 9 Train on Jiahua Metro Bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
LocaleChongqing, China
Termini
Stations31 (29 in operation)
Websitehttps://www.cqmetro.cn
Service
TypeRapid transit
SystemChongqing Rail Transit
Services1
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022; 2 years ago (2022-01-25)[1]
Technical
Line length32.29 km (20.06 mi)[2][3] (Phase 1)
7.8 km (4.8 mi)[4] (Phase 2)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line1,500 V DC
Operating speed100 km/h (62 mph) (Maximum)
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Xiaolongkan
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Jiahua Rail Transit Bridge
across Jialing River
Lijiaping
Mahuangliang
Guanyinqiao
Liyuchi
Liujiatai
Jiangbeicheng
Wulidian
Gailanxi
Toutang
Baoshuigang
Cruise Port
Line 4 to Huangling
Hejialiang
Shipanhe
Shangwanlu
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

YouTube Encyclopedic

  • 1/1
    Views:
    551
  • 1st video Chongqing Metro.mp4

Transcription

History

The line began construction on September 28, 2016.

Opening timeline

Segment Commencement Length Station(s) Name
GaotanyanXingke Ave.[a][1] 25 January 2022 31.3 km (19.4 mi) 23 Phase 1
Baoshenghu 28 July 2022[5] infill station 1
Xingke Ave.Huashigou 18 January 2023 7.8 km (4.8 mi)[6] 5 Phase 2
  1. ^ except Cruise Port and Baoshenghu stations.

Stations

Service
routes
Station
No.
Station name Connections Distance
km
Location
English Chinese
9/01 Xinqiao 新桥 - 0.0 Shapingba
9/02 Gaotanyan 高滩岩 1.9 1.9
9/03 Tianlilu 天梨路 1.2 3.0
9/04 Shapingba 沙坪坝 1 Loop  27 
Shapingba railway station CYW
1.3 4.3
9/05 Xiaolongkan 小龙坎 1 1.0 5.3
9/06 Tuwan 土湾 1.1 6.3
9/07 Hongyancun 红岩村 5 1.2 7.6 Yuzhong
9/08 Fuhualu 富华路 18 1.1 8.7
9/09 Hualongqiao 化龙桥 1.9 10.6
9/10 Lijiaping 李家坪 1.6 12.2 Jiangbei
9/11 Mahuangliang 蚂蝗梁 0.9 13.0
9/12 Guanyinqiao 观音桥 3[a] 1.0 14.0
9/13 Liyuchi 鲤鱼池 10 1.7 15.7
9/14 Liujiatai 刘家台 1.2 16.9
9/15 Jiangbeicheng 江北城 6 1.0 17.9
9/16 Wulidian 五里店 6 Loop 1.2 19.1
9/17 Gailanxi 溉澜溪 1.0 20.1
9/18 Toutang 头塘 4 1.7 21.9
9/19 Baoshuigang 保税港 4 1.4 23.2
9/20 Cruise Port 邮轮母港 0.9 24.1
9/21 Hejialiang 何家梁 0.7 24.8
9/22 Shipanhe 石盘河 1.6 26.4 Yubei
9/23 Shangwanlu 上湾路 10 1.9 28.3
9/24 Qinggangping 青岗坪 1.7 30.0
9/25 Baoshenghu 宝圣湖  15  2.0 32.0
9/26 Xingke Ave. 兴科大道 1.2 33.2
9/27 Chunhua Ave. 春华大道 2.3 35.5
9/28 Langui Ave. 兰桂大道 1.0 36.5
9/29 Central Park East 中央公园东 10 1.2 37.6
9/30 Congyansi 丛岩寺 2.6 40.2
9/31 Huashigou 花石沟 1.1 41.3
  1. ^ out of system transfer

Station details

Xingke Ave. station

Xingke Ave. station[7] (Chinese: 兴科大道站; pinyin: Xīngkēdàdào zhàn) is located in the Yubei District. The station opened on January 25, 2022.[8] There are four exits for this station. Currently only two exits (numbered 1 and 3) are opening.[9]

Gallery

References

  1. ^ a b "轨道九号线一期本月开通运营". 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022. 全长32.289km;共设站26座,本次开通的车站23座
  3. ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  4. ^ "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.
  5. ^ "重庆地铁9号线一期宝圣湖站28日14时开通运营".
  6. ^ "重庆地铁9号线二期通过项目工程验收". 重庆地铁9号线二期工程(兴科大道—花石沟)线路全长约7.8公里,共设5座车站
  7. ^ "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on April 17, 2022.
  8. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022.
  9. ^ "带你探站9号线——兴科大道站 回兴片区又多了一个轨道站". January 28, 2022. Archived from the original on June 21, 2022. Retrieved June 21, 2022.
This page was last edited on 28 December 2023, at 14:07
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.