To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Tren de los Pueblos Libres

From Wikipedia, the free encyclopedia

Tren de los Pueblos Libres
Paso de los Toros, terminus in Uruguay
Overview
StatusInactive
OwnerGovernment of Argentina
Government of Uruguay
LocaleArgentina, Uruguay
Termini
Stations13
Service
TypeInter-city
Services1
Operator(s)Argentina TBA
Uruguay AFE
History
OpenedSep 2011
ClosedMay 2012; 11 years ago (2012-05)
Technical
Line length813 km (505 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

The Tren de los Pueblos Libres ("Train of the Free Peoples") was an 813-km length rural railway line that connected Argentina and Uruguay, being operated by both the Argentine private company Trenes de Buenos Aires (TBA) on General Urquiza Railway standard gauge rail tracks, and Uruguayan the State-owned State Railways Administration of Uruguay "Administración de Ferrocarriles del Estado" (AFE).

YouTube Encyclopedic

  • 1/2
    Views:
    3 848
    608
  • El Tren Trasandino, Pasado, Presente y Futuro: Los Andes, Chile - Mendoza, Argentina.
  • El Tren de los Pueblos Libres Argentina Uruguay: Abandonado.

Transcription

History

Pilar, terminus in Argentina.

The train had run from 1982 to 1985 between cities of Concordia (Argentina) and Salto (Uruguay). After 26 years of being active only for freight trains, the service was officially re-opened on August 11, 2011, in a ceremony held by Presidents of both countries.[1] On 23 September the train made its first journey carrying people from Pilar to Paso de los Toros.

Some intermediate stops were Argentine stations Zárate, Enrique Carbó, Urdinarrain, Basavilbaso, Villaguay, San Salvador and Concordia and Uruguayan Salto, Quebracho and Paysandú. From Pilar to Buenos Aires passengers were carried by bus.

The project included the intention for trains to reach Montevideo in December 2011,[2][3] although it would never be carried out.

On its first official journey, the train only reached Salto due to the Uruguayan Ministry of Transport still not having given authorisation for the service to operate in the country. Therefore, all passengers had to get out in Salto and the train continued without people to Paso de los Toros. The service was finally restarted on 30 September. Nevertheless, the service ran to Paso de los Toros only five times, with the terminus set up in Paysandú from November 2011.[4]

From March 2012, the service was shortened again, setting Salto as terminus of the line. Afterwards, in May 2012 the Government of Argentina revoked the contract of concession to TBA[5] after the Once rail disaster in which 51 people died and at least 703 people were injured on a service operated by the same company.[6] Finally, on 28 May the service was interrupted and subsequently never restarted. The railcars that served the line are currently abandoned in Pilar.[7][8][9][10]

Gallery

See also

References

External links

This page was last edited on 20 January 2024, at 15:11
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.