To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Munich–Augsburg Railway Company

From Wikipedia, the free encyclopedia

The Munich–Augsburg Railway Company (München-Augsburger Eisenbahn-Gesellschaft), the second private railway company in Bavaria, built the Munich–Augsburg line between 1838 and 1840. It was nationalised in 1846 and became part of the Royal Bavarian State Railways, subsequently forming part of the Bavarian Maximilian’s Railway built between 1851 and 1854.

Foundation and Construction of the Railway

After the opening of the first private railway in Bavaria, the Bavarian Ludwig Railway from Nuremberg to Fürth on 7 December 1835, local committees for the construction of railway lines grew up all over Bavaria. The two committees in Augsburg and Munich soon united and had a civil servant draw up a route proposal. The task of carrying out the detailed planning and construction was given to the engineer, Paul Camille Denis, who had just completed the Nuremberg-Fürth line.

After the state had issued the "Basic Regulations for All Railway Statutes in Bavaria" (Fundamentalbestimmungen für sämtliche Eisenbahnstatuten in Bayern) on 28 September 1836, the Munich–Augsburg Railway Company was founded on 23 July 1837. On 3 July 1837, they had already been given the royal assent. However, there were difficulties with the shareholder applications in the early days as a result of delays in obtaining the state licence. Nevertheless, the construction of the railway got under way at the beginning of 1838.

The line, which was almost 62 kilometres (39 mi) long, was opened to traffic in four stages:

  • 1 September 1839; MunichLochhausen; 12.5 km (7.8 mi)
  • 27 October 1839; Lochhausen – Olching; 6.6 km (4.1 mi)
  • 7 December 1839; Olching – Maisach; 5.7 km (3.5 mi)
  • 4 October 1840; Maisach – Augsburg; 37.1 km (23.1 mi)

For over 20 years, the river Lech was crossed by a 95-metre (312 ft) long wooden bridge. It is reported that King Ludwig I directed that the final opening ceremony would coincide with the beginning of the Oktoberfest.

Locomotives

The company procured a total of eight locomotives from various manufacturers that were all fired with wood. All had interior cylinders and a 1A1 axle arrangement.

Nationalisation

By a law dated 23 May 1846, the Munich–Augsburg Railway Company was nationalised on 1 June 1846 and taken over by the Royal Bavarian State Railways (Königlich Bayerische Staats-Eisenbahnen). The state paid the shareholders 4.4 million florins.

Literature

  • Ludwig von Welser: Bayern-Report, Bände 4–9. Fürstenfeldbruck 1994–2001
This page was last edited on 10 September 2022, at 05:41
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.