To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

King–Liberty GO Station

From Wikipedia, the free encyclopedia

King–Liberty
General information
LocationNorth of King Street West between Joe Shuster Way and Sudbury Street
Toronto, Ontario
Coordinates43°38′27″N 79°25′26″W / 43.6409°N 79.4239°W / 43.6409; -79.4239
Owned byMetrolinx
Platforms2 island platforms[1]: 18 
Tracks4[1]: 18 
Connections TTC buses 501 Queen 504 King
Construction
AccessibleYes
History
Opening2026[1]: 11 
Services
Preceding station GO Transit Following station
Bloor
towards Kitchener
Kitchener
Planned expansion
Union Station
Terminus

King–Liberty GO Station (also referred to as Liberty Village) is a planned commuter train station in Toronto, Ontario, Canada. It will be an infill station on the Kitchener line of GO Transit located between Union Station and Bloor GO Station. The station is one of five GO stations to be built as part of the SmartTrack Stations Program to adapt regional commuter service for urban public transit.[2] The construction contract was awarded in 2022; construction is to start in January 2024 for completion in March 2028.[3]

YouTube Encyclopedic

  • 1/3
    Views:
    545
    60 778 552
    144 562
  • Liberty Market Tower By Lifetime Developments
  • Jack & Jill | Kids Songs | Super Simple Songs
  • Could they Clean the Statue of Liberty?

Transcription

Description

The station will be located between Joe Shuster Way and Sudbury Street, north of King Street West. The station building will have two glass towers suspending a glass-enclosed bridge over the tracks with stairs and elevators descending to the two island platforms. One tower will face Joe Shuster Way and the other Sudbury Street. From the Sudbury Street tower, there will be a long enclosed ramp descending from bridge level to street level between Sudbury Street and the railway right-of-way towards Queen Street. The station service building will be located at the foot of the ramp. On the north side of King Street and at the west portal of the King Street West Subway Bridge, there will be another tower with a pedestrian bridge crossing over to the island platforms at their southern end. From the base of this tower there will also be a pedestrian bridge crossing King Street parallel to the railway bridge. This will give the station four entry points.[1]: 14–16, 18 [4]: 8–9  The entrance towers will have elevators, and the platforms will have canopies. There will be bicycle parking at each entrance. Bicycles will be allowed on the ramp along Sudbury Street to allow cyclists to cross over the tracks to Joe Shuster Way.[5]: 17:48 

There are seven tracks passing through the future station area. The new station platforms will serve the four tracks of the Kitchener line. Ultimately, there could be eight tracks through the area.[5]: 24:30 

Construction

During planning, Metrolinx had to take three heritage structures into account:[1]: 20–21 

  • The building at 55 Sudbury Street (opposite Dovercourt Road) will be protected from construction activity.
  • The building at 99 Sudbury Street (opposite Lisgar Street) will be demolished to make way for station construction. Before demolition, Metrolinx will photo-document the structure for commemorative purposes. Bricks from the building will be salvaged for possible reuse.
  • A small portion of the King Street West Subway Bridge will be impacted by construction.

TTC connections

TTC routes that may serve the new station are:[1]: 13 

References

  1. ^ a b c d e f "King-Liberty GO Station" (PDF). Metrolinx. November 18, 2021. Archived from the original (PDF) on December 1, 2021.
  2. ^ "SmartTrack Stations Program". Metrolinx. Archived from the original on November 23, 2021. Retrieved December 9, 2021.
  3. ^ "From a planned 22 stations to five. How did John Tory's $8-billion SmartTrack public transit plan go off the rails?". Toronto Star. March 27, 2023.
  4. ^ "SmartTrack stations program technical update" (PDF). City of Toronto. Retrieved March 27, 2021.
  5. ^ a b "SmartTrack King-Liberty GO Station - LIVE Event". Metrolinx. November 18, 2021.

External links

This page was last edited on 9 November 2023, at 18:45
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.