To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Appleby GO Station

From Wikipedia, the free encyclopedia

Appleby
General information
Location5111 Fairview Street
Burlington, Ontario
Coordinates43°22′45″N 79°45′41″W / 43.37917°N 79.76139°W / 43.37917; -79.76139
Owned byMetrolinx
Platforms2 island platforms
Tracks4
Connections Burlington Transit
Construction
Structure typeStation building
Parking1,217 north lot
1,205 south lot
2,422 Total spaces
Bicycle facilitiesRacks
Other information
Station codeGO Transit: AP
Fare zone15
History
Opened19 September 1988
Services
Preceding station GO Transit Following station
Burlington Lakeshore West Bronte
Burlington Lakeshore West
(peak express)

Appleby GO Station is a railway station and bus station in the GO Transit network located in the 5000 block of Fairview Street in Burlington, Ontario in Canada near Appleby Line. It is a stop on the Lakeshore West line train service.

This station primarily serves residential areas in the eastern part of Burlington with train services on weekdays and weekends. There are connecting Burlington Transit local bus services.[1]

Renovations began in the fall of 2014, incorporating repairs to the parking lots, relocation of the south drop-off area, the addition of energy efficient lighting and reconstruction of the south bus loop.[2]

YouTube Encyclopedic

  • 1/3
    Views:
    1 624
    3 335
    30 790
  • GO Train @Scarborough Station
  • GO Transit Lakeshore West (Toronto Union - Burlington) - March 16th, 2016
  • GO Train from Burlington to Toronto-Saturday May 29th 2010

Transcription

Burlington Transit connecting service

  • 1 Plains-Fairview
  • 4 Central
  • 10 New-Maple
  • 11 Sutton-Alton
  • 25 Walkers
  • 80 Harvester
  • 81 North Service (Peak Service only)

Oakville Transit connecting service

  • 14/14A Lakeshore West

References

  1. ^ "Appleby GO Station" (PDF). GO Location Maps. City of Burlington. Archived from the original (PDF) on 23 September 2015. Retrieved 6 February 2018.
  2. ^ "Modernizing Stations – Appleby GO Station". GO Transit. Archived from the original on 4 March 2016. Retrieved 4 March 2016.

External links

Media related to Appleby GO Station at Wikimedia Commons


This page was last edited on 2 June 2023, at 17:29
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.