To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Rio de Janeiro Light Rail

From Wikipedia, the free encyclopedia

Rio de Janeiro Light Rail
Overview
Native nameVLT Carioca
Owner Municipality of Rio de Janeiro
LocaleRio de Janeiro, RJ, Brazil
Transit typeLight rail
Number of lines4
Number of stations43
Websitewww.vltrio.com.br
Operation
Began operation5 June 2016
Operator(s) VLT Carioca
CharacterAt-grade
Number of vehicles32 Alstom Citadis 402 trams[1]
Train length44 m (144 ft 4+14 in)
Headway3-15 minutes
30 minutes (night)
Technical
System length28 km (17 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC (Alstom APS/SRS)[1][2]
Average speed15 km/h (9.3 mph)
System map

Rio de Janeiro Light Rail (Portuguese: VLT Carioca) is a modern light rail system serving Rio de Janeiro, Brazil. The system is among several new public transport developments in the region ahead of the city's successful bid for the 2016 Summer Olympics.[1] Its official name is VLT Carioca, the initialism "VLT" (which stands for veículo leve sobre trilhos, literally Light vehicle on rails) being equivalent to the English term light rail.

YouTube Encyclopedic

  • 1/4
    Views:
    42 301
    594
    799
    1 007
  • Light rail of Rio de Janeiro, VLT Carioca.
  • Customer interview: Rio de Janeiro's VLT Carioca light rail vehicle project
  • Rio de Janeiro Light Rail - A Dica do Dia
  • World Metro Systems: Rio de Janeiro Metro

Transcription

Overview

The inaugural LRT service passing Rio de Janeiro's Theatro Municipal.
Light rail in the Cinelândia station.

The first phase, consisting of a single 15-kilometre line between the Novo Rio Bus Terminal and Santos Dumont Airport and 18 stops,[3] was inaugurated on 5 June 2016, two months ahead of the Olympics opening ceremony,[4] with regular service beginning the following day. For the first month of operation, it was free of charge to ride, but only two trams were in service between noon and 15:00 on the section between Parada dos Museus in Praça Mauá and Santos Dumont Airport.[1] The remainder of the line was opened and service was expanded to full-time operation on 12 July, although only 16 of the 18 stops on the line are in use.

The network uses 32 Alstom Citadis 402 low-floor trams carrying 420 passengers each. They are bi-directional, air-conditioned, have seven sections, and eight doors per side. The first five trams were built in Alstom's facility in La Rochelle, France and shipped to Rio in July 2015,[5] and the remaining 27 were built in Alstom's facility in Taubaté, in the state of São Paulo.[2]

There are no overhead lines installed along the entire route. Instead, Alstom has equipped approximately 80% of the line with its proprietary ground-level power supply (APS) system. The remaining 20% uses on-board supercapacitor-based energy storage (SRS), also developed by Alstom.[6] Trams are still equipped with pantographs for use in the maintenance facility.

The remainder of the three-line, 28-km network will open in stages by the end of 2017.[needs update] It is estimated that when the entire network is at full capacity, it would be able to eliminate 60% of buses and 15% of automobile traffic circulating in the city centre.

See also

References

  1. ^ a b c d "Rio's trams will run for the Olympics: Brazil's wire-free modern tramway opens, part of a major revitalisation project for Rio de Janeiro" (July 2016). Tramways & Urban Transit, p. 244. UK: LRTA Publishing.
  2. ^ a b "Rio de Janeiro tramway inaugurated". Railway Gazette International. 6 June 2016. Archived from the original on 4 June 2019. Retrieved 15 October 2016.
  3. ^ "Light Rail". Companhia de Desenvolvimento Urbano da Região do Porto do Rio de Janeiro. 22 May 2011. Archived from the original on 29 November 2014. Retrieved 17 November 2014.
  4. ^ Belen, Nelson (6 June 2016). "After Two Week Delay, VLT Opens in Rio de Janeiro". The Rio Times. Archived from the original on 7 June 2016. Retrieved 7 June 2016.
  5. ^ "First Alstom Citadis Tram Delivered to Rio de Janeiro". Railway News. 10 July 2015. Archived from the original on 29 October 2021. Retrieved 4 November 2017.
  6. ^ "UITP 2015: Alstom launches SRS, a new ground-based static charging system, and extends its APS solution to road transportation". Alstom. 1 June 2015. Archived from the original on 18 June 2018. Retrieved 4 November 2017.

External links

This page was last edited on 28 May 2024, at 02:09
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.