To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

London Climate Change Agency

From Wikipedia, the free encyclopedia

London by night seen from the International Space Station

The London Climate Change Agency Limited (LCCA), was a municipal company owned by the London Development Agency (LDA) that worked in partnership with private sector companies (notably EDF Energy) to design, finance, construct, own and operate decentralised low energy and zero-carbon projects for London, as well as providing services to others. It operated in the areas of energy, water, waste and transport. In 2009 it was integrated into the London Development Agency.

The Agency was launched on 20 June 2005 to implement a manifesto commitment by Ken Livingstone in the 2004 elections for the Mayor of London. Its budget for 2006–07 was £815,000, 63% of which was funded directly by the LDA.[1] The Chief Executive Officer was Allan Jones, who previously led the development of the pioneering sustainable community energy system in Woking. The London Climate Change Agency plans to create a similar system for London.

As of 2006, London produced 7% of the UK's carbon emissions.[2] The LCCA was seen as one of the key vehicles for delivering the Mayor's energy strategy,[3] which targets cuts in these emissions of 20% by 2010 and 60% by 2050 (although achieving the first of these targets was unlikely). The Agency was also expected to play a role in ensuring that the 2012 Summer Olympics in London were the first to be powered by low carbon technology.[4]

YouTube Encyclopedic

  • 1/3
    Views:
    7 320
    6 905
    2 417
  • Mayor's Low Carbon Prize -- London's greener future
  • Environmental Impacts of Transportation
  • Preparing for Copenhagen: How Developing Countries Are Fighting Climate Change

Transcription

Renewable energy installations

In 2007 the LCCA received planning permission for a number of renewable energy installations including: solar photovoltaic cells at City Hall,[5] the UK's first combined photovoltaic and wind turbine system at the Palestra building, Blackfriars Road[6]

See also

References

  1. ^ [1][permanent dead link]
  2. ^ Tatiana Bosteels (July 2006). "London planning for climate change" (PDF). Livingwithclimate.fi. Archived from the original (PDF) on 16 August 2021.
  3. ^ "The Mayor's Energy Strategy". london.gov.uk. Archived from the original on 2 May 2009.
  4. ^ "Defra, UK - "One Planet Olympics" – London plans the most sustainable Olympic Games ever". 1 January 2007. Archived from the original on 1 January 2007.
  5. ^ "Construction and Maintenance :: London's City Hall Goes Solar". 13 March 2007. Archived from the original on 13 March 2007.
  6. ^ "News & Press Archive - UK's first combined photovoltaic and wind turbine system to be installed in central London : London Development Agency". 22 September 2006. Archived from the original on 22 September 2006.

External links

This page was last edited on 26 June 2022, at 09:19
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.