To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Winscales Moor Wind Farm

From Wikipedia, the free encyclopedia

Winscales Moor Wind Farm
Vestas wind turbines
Map
CountryEngland, United Kingdom
Locationnear Winscales, Cumbria
Coordinates54°38′24″N 03°29′49″W / 54.64000°N 3.49694°W / 54.64000; -3.49694
StatusOperational
Commission dateMay 2009
Owner(s)Mistral
Power generation
Units operational7 X 0.85 MW
Make and modelVestas
Nameplate capacity5.95 MW
External links
Websitewww.winscalesmoorwindfarm.com
CommonsRelated media on Commons

Winscales Moor Wind Farm is a group of 7 turbines located between the A595 and A66, near Winscales, in Cumbria, England. The turbines have a tip height of 81 metres, the total installed capacity is 5.95 MW. The wind farm was developed by Your Energy Ltd and is owned by Mistral Windfarms. Engineering Renewables Ltd manage the construction and operation.

Description

Otherwise known as the Winscales Extension, it is located adjacent to the original Winscales Wind Farm, built in 1999. There are seven Vestas V52 turbines producing an annual energy output of 18,800 MWh, equivalent to the needs of approximately 4,000 households.

Your Energy Ltd submitted an application to Allerdale Borough Council in December 2006 for approval and planning permission was granted in June 2007. It became operational in May 2009.

Cumbrian firm Story Construction were the main contractor appointed to build the wind farm. The Vestas turbines are 81 metres high: 50 metres to the hub and a 62-metre diameter rotor.

The wind farm will contribute £130,000 during its life towards projects in the parishes of Winscales, Great Clifton and Little Clifton.

Local projects to benefit include the Great Clifton Village Hall which received £5,200 towards a new central heating system, and Little Clifton Village Hall received £8,000 towards renovations.[1]

The fund is administered by the Cumbria Community foundation[2]

The wind farm is featured on a Windspotting Brochure produced for tourists to the area.

References

  1. ^ "Village gets energy-saving help from wind farm community fund". Workington Times & Star. 14 November 2008. Archived from the original on 20 February 2012.
  2. ^ "Applying for a grant". Cumbria Community Foundation. Archived from the original on 25 July 2011.

External links

This page was last edited on 26 February 2023, at 23:24
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.