To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Kilgallioch Wind Farm
Map
CountryScotland, United Kingdom
LocationSouth Ayrshire
Coordinates55°03′00″N 4°45′54″W / 55.05°N 4.765°W / 55.05; -4.765
StatusOperational
Construction began2015
Commission date
  • 2 January 2017
Owner(s)
Operator(s)
Wind farm
Rotor diameter
  • 114 m (374 ft)
Power generation
Units operational2 × 2 MW
94 × 2.5 MW
Make and modelGamesa G114-2.5 MW (94)
Gamesa G90-2.0 MW (2)
Nameplate capacity
  • 239 MW
External links
Websitewww.scottishpowerrenewables.com/pages/kilgallioch.aspx

Kilgallioch Wind Farm is a 96 turbine wind farm in South Ayrshire, Scotland with a total capacity of up to 239 megawatts (MW).[1] Consent granted by the Scottish Government in February 2013 with construction starting in 2015 and completed in 2017. The wind farm contains 70 km of internal tracks, and a surface area of roughly 32 km2.

YouTube Encyclopedic

  • 1/5
    Views:
    8 730
    3 940
    388
    791
    328
  • How to deal with the Scottish Midge while walking the Southern Upland Way
  • Ticks and Lyme Disease, what they are and how to deal with them when walking in Southern Scotland
  • The Southern Upland Way Hoard - Hidden treasure you can collect along the trail.
  • The New Southern Upland Way Road Cycle Route 200 miles coast to coast across Scotland
  • Archaeology Days on the Rhins of Galloway Coast Path

Transcription

Incidents

On 13 January 2017 a turbine under construction catastrophically collapsed during a storm.[2][3]

On 15 March 2017 Portuguese construction worker António João Linares, who was working for turbine manufacturer Gamesa, was killed when he fell 8 metres within a tower.[4][5]

History

Project history

The wind farm construction was completed and began operating in 2017. SPR have identified this area to the south of Kilgallioch Windfarm as having great potential to be an extension to the site.[6]

A met mast was installed at High Eldrig in 2018 as a part of the development process, the mast was used to gather information on wind conditions at the site.[6] In April 2019 a scoping report was sent to the Scottish Government’s Energy Consent Unit.[6]

Scottish Power Renewables (SPR) submitted an Addendum (Al1) to this applicant request for authorization to remove proposed solar arrays from the design site. Al1 was then advertised and consulted from January to February 2021.[6]

Following the consultation with Historic Environment Scotland(HES) in September 2021, SPR has submitted another Addendum(Al2) to the request for authorization to remove two wind turbines (T1 and T11) from the site design. AL2 was then advertised and consulted from September to November 2021.[6]

Current stage

Consent was granted to Scottish Power Renewables(UK) Limited (SPR) by Scottish Ministers on 8 December 2021 to construct and operate Kilgallioch Windfarm Extension.[7] The construction consist of an electricity generating station with generation capacity of 50MW when the station is combined with the existing Kilgallioch Wind Farm, which consists of 9 wind turbines, located approximately 9.5 km north west of Kirkcowan in the authority of Dumfries and Galloway Council and South Ayrshire Council, together with the planning permission under section 57(2) of the Town & Country Planning Act (Scotland) 1997.[7]  Consent was granted for 9 turbines with the maximum height of 180m with the generating capacity of 50mw.[7]  

See also

References

  1. ^ "Kilgallioch Windfarm - ScottishPower Renewables". www.scottishpowerrenewables.com. Retrieved 18 March 2017.
  2. ^ Houston, Stephen (29 January 2017). "Panic as giant 480ft wind turbine collapses". dailyrecord. Retrieved 18 March 2017.
  3. ^ "Kilgallioch wind farm turbine incident under investigation". BBC News. 20 January 2017. Retrieved 18 March 2017.
  4. ^ "Português morre em queda de 150 metros na Escócia". Retrieved 18 March 2017.
  5. ^ "Worker dies in Kilgallioch wind farm accident". BBC News. 16 March 2017. Retrieved 18 March 2017.
  6. ^ a b c d e "Kilgallioch Windfarm Extension". ScottishPower Renewables. Retrieved 7 October 2022.
  7. ^ a b c "Notice of decision" (PDF). scottishpowerrenewables.com. Retrieved 9 March 2024.


This page was last edited on 9 March 2024, at 12:04
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.