To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Viborg Power Station

From Wikipedia, the free encyclopedia

Viborg Power Station
Viborg Power Station, July 2014. (Photo: Kim Hansen)
Map
CountryDenmark
LocationViborg
Coordinates56°28′25.88″N 9°24′54.4″E / 56.4738556°N 9.415111°E / 56.4738556; 9.415111
StatusOperational
Commission date1996
Owner(s)Energi Viborg
Thermal power station
Primary fuelNatural gas
Combined cycle?Yes
Cogeneration?Yes
Power generation
Nameplate capacity57 MW
External links
CommonsRelated media on Commons

Viborg Power Station (Danish: Viborg Kraftvarmeværk) is a natural gas-fired power station operated by Energi Viborg in Viborg, Denmark.

It can provide 57 MW of electric power from a General Electric Frame 6 gas turbine and a W.H.Allen steam turbine, and 57 MJ/s of district heating. It is used about 5,000 hours per year. The hot water tank contains 19,000 m3, suitable for 15 hours of cold weather consumption.[1]

The station is to be used as a hub for distributing district heating from the coming Apple data center near Foulum and Tjele. Consultants calculate that the best economy for Viborg's district heating is a system where Apple's cooling water is used to provide heat for 7 MWe heat pumps at the data center delivering 55 MJ/s of heating (and cooling for Apple), with an overall Coefficient of performance of 8. The transmission water temperature is raised from 30 to 50 °C and then pipelined 10 km to Viborg, where further heat pumps raise (and keep) the local heat to 60 °C. The start cost is estimated at DKK 316 million,[2] and running costs of DKK 265/MWh, compared to the 2017 price of DKK 413/MWh and natural gas at over DKK 500/MWh. Conversely, Apple's cooling water is lowered in temperature by the heat pumps. Viborg's expected heat demand is between 10 MJ/s in summer and 90 MJ/s (peak) in winter, for an annual consumption of 307 GWh. The heating difference between the 55 MJ/s heat from Apple and the 90 MJ/s peak demand is covered by gas boilers.[3]

See also

References

  1. ^ Facts about the plant Archived April 5, 2012, at the Wayback Machine Energi Viborg. Accessed: 6 December 2011.
  2. ^ Pedersen, Maria Berg Badstue (7 June 2017). "Det koster 316 millioner at udnytte varmen fra Apple". Energy Supply DK. Retrieved 8 June 2017.
  3. ^ "Analyse af balanceret fjernvarme" (PDF). NIRAS. May 2017. pp. 1+2, 13+14, 17, 22+23, 37, 44. Retrieved 8 June 2017.

External links


This page was last edited on 14 August 2023, at 03:55
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.