To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Trunkline Pipeline

From Wikipedia, the free encyclopedia

Trunkline Pipeline is a natural gas pipeline system which brings gas from the Gulf coast of Texas and Louisiana through Mississippi, Arkansas, Tennessee, and Kentucky to deliver gas in Illinois and Indiana. It connects to the Henry Hub, Egan Hub, and Perryville Hub. The total length of the system is 3,059 miles (4,923 km) and its capacity is 1.5 billion cubic feet per day (42 million cubic metres per day). It is operated by Trunkline Gas Company, a subsidiary of Energy Transfer Partners. Its FERC code is 30.[1]

The pipeline project started when on March 12, 1947, independent owners of South Texas gas reserves incorporated Trunkline Gas Supply Company. In 1949–1950, the project was taken over by Panhandle Eastern energy company.[1]

In 1998, the pipeline was acquired by CMS Energy from Duke Energy, which absorbed Panhandle Eastern few years earlier.[2]

In 2012, it was announced that a 770-mile (1,240 km) section of the pipeline will be converted to crude oil pipeline to transport Canadian and Bakken oil from Patoka, Illinois, to St. James, Louisiana.[3] This project was cancelled.[4] In 2014, the Energy Transfer Crude Oil Pipeline Project (ETCOP) was announced. ETCOP will use 678 miles (1,091 km) of the existing 30-inch (760 mm) Trunkline, which will be converted and reversed. In addition, 66 miles (106 km) of new pipeline will be built. In Patoka, the ETCOP will be connected with the Dakota Access Pipeline. The pipeline runs through Illinois, Kentucky, Tennessee, Mississippi, Arkansas, and Louisiana, and its terminus will be near Nederland, Texas. The pipeline will have a capacity of 450,000–570,000 barrels per day (72,000–91,000 m3/d).[4][5]

See also

References

  1. ^ Castaneda, Christopher J.; Smith, Clarance M. (2003). Gas Pipelines and the Emergence of America's Regulatory State: A History of Panhandle Eastern Corporation, 1928–1993. Cambridge University Press. pp. 128–131. ISBN 9780521567329.
  2. ^ "CMS Buys Panhandle, Trunkline to Feed Midwest Power". Natural Gas Intelligence. 1998-11-09. Retrieved 2016-11-05.
  3. ^ Smith, Christopher E. (2013-02-20). "Enbridge, Energy Transfer to convert Trunkline segment to crude service". Oil & Gas Journal. Retrieved 2016-11-05.
  4. ^ a b "ETP to build Bakken crude line to Nederland". Argus Media. 2014-06-25. Retrieved 2016-11-05.
  5. ^ "Energy Transfer Crude Oil Pipeline Project (ETCOP)" (PDF). Energy Transfer Partners. September 2014. Retrieved 2016-11-05.

External links

This page was last edited on 3 October 2020, at 18:50
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.