To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

TransMiCable
Overview
StatusOperational
CharacterUrban
LocationBogotá, Colombia
TerminiPortal del Tunal (TransMilenio)
Mirador del Paraíso
OpenDecember 27, 2018; 5 years ago (2018-12-27) (Line T)
Technical features
Line length3,340 m (10,960 ft) (Line T)
Operating speed10 miles per hour (16 km/h)
NotesElectric motor powering cable bullwheel

TransMiCable is a gondola lift system implemented by the city of Bogotá, Colombia, with the purpose of providing a complementary transportation service to TransMilenio. Line T, with a length of 3,34 km[1] and four stations, connects the Portal del Tunal (TransMilenio) station to Mirador del Paraíso station in the steep hills of Ciudad Bolívar district and was opened on 27 December 2018.[2] It is part of the city's Integrated Public Transport System, along with TransMilenio and the urban, complementary and special bus services operating on neighbourhoods and main streets.

The system was built in 26 months and is designed to transport 7,000 people per hour.[1]

Infrastructure

TransMiCable consists of one gondola lift line (Line T) with a length of 3.34 km located in Ciudad Bolívar district in the south of the city.

Line T
Station Interchange Location
Tunal Portal del Tunal H Villavicencio Avenue and Boyacá Avenue
Juan Pablo II SITP
67C South street and 18R road
Manitas SITP
70G South street and 18K road
Mirador del Paraíso SITP
71H South street and 27 road

The second line was awarded to the Doppelmayr consortium in March 2023. It will be a 2.8km-line constructed in the San Cristóbal locality.

San Cristobal line
Station Interchange Location
20 de Julio Portal 20 de Julio L 30a South street and 4 road
Victory SITP
41 South street and 3 East road
Altamira SITP
43a South street and 12b East road

See also

Manitas station

Media related to TransMiCable at Wikimedia Commons

References

  1. ^ "IDU | TransMiCable". www.idu.gov.co (in Spanish). Retrieved 2019-03-18.
  2. ^ "En imágenes: Así fue la inauguración del Transmicable en Ciudad Bolívar". ELESPECTADOR.COM (in Spanish). 2018-12-27. Retrieved 2019-03-18.

External links

This page was last edited on 31 October 2023, at 01:42
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.