To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Comber Greenway

From Wikipedia, the free encyclopedia

54°36′04″N 5°53′48″W / 54.6010°N 5.8967°W / 54.6010; -5.8967

The Comber Greenway is a 7-mile (11 km) traffic-free section of the National Cycle Network that runs along the old Belfast-Comber railway line. The cycle path starts on Dee Street in east Belfast and finishes at Comber in County Down.[1] As well as a cycling path, it is also popular with people on foot. The most recent addition to the route was in November 2008 when the final link between Old Dundonald Road/Comber Rd junction and Comber was opened. This added 1.6 miles (2.6 km) to the route.[2] One section runs through a SLNCI-designated Wetland ecosystem.

YouTube Encyclopedic

  • 1/3
    Views:
    1 782
    1 352
    422
  • Riding the Comber Greenway
  • sustrans bike ride along the comber greenway
  • Driving Through Comber with Mum Northern Ireland Sept 2015

Transcription

Route

The traffic-free route starts at Dee Street in East Belfast and passes the C. S. Lewis statue at the Holywood Arches, along the Bloomfield Walkway to Sandown Road where it continues past the PSNI headquarters to a newly installed toucan crossing at the Knock Road.

From here it goes to Kings Road and on to Abbey Road, through Tullycarnet and Ardcarn to East Link Road in Dundonald.

It continues through a wetland area emerging at the Comber Road, Dundonald where there is a toucan crossing.

The route continues from Comber Road, Dundonald past the Billy Neill Centre for Soccer Excellence where the former railway line passes near the Enler River. Walkers and cyclists can cross the River Enler and farm lanes by a series of reinstated bridges before reaching its end at Belfast Road, Comber.

On its route the Greenway passes through former Belfast and County Down Railway stations at Bloomfield, Neill's Hill, Knock, Dundonald before finishing just short of Comber station.

History

The current route of the Greenway was originally the main line of the Belfast and County Down Railway.[3] The railway was in use from 1850s until 1950 when the Ulster Transport Authority closed it. Through the 1950s the track was lifted in phases and infrastructure, including bridges, removed. The remains of Neill's Hill station survive near Sandown Road behind Clara Park and Sandhill Gardens.

In 1964 it was proposed that a section of what is now the Greenway be utilised for the M7 Motorway project.[4] This motorway was not built. The Belfast Urban Area Plan 2001 included a proposal for a smaller-scale road along the same route, but that was never built either.

By late in the century the Greenway had become a recreation path for walkers, cyclists etc. In 2003–04 the Knock Valley Relief Sewer was installed from Ballymacarett to Dundonald resulting in substantial excavation along the path. Subsequently a number of government agencies contributed funds to upgrade the Greenway with a modern hard surface, road crossings and, with the opening of the section alongside Police Headquarters, a continuous route from inner Belfast to Comber. It was officially opened on 8 November 2008.

EWAY proposal

As part of the Belfast Metropolitan Transport Plan 2015 published in November 2004, a rapid transport scheme was proposed for three routes in Belfast. The route to the east of the city, dubbed EWAY, proposed utilising the Greenway for either a light rail or bus link for Belfast.

Consultants Atkins and KPMG subsequently completed a preliminary assessment of the proposals. Key conclusions include the preference for bus over light rail on cost grounds and the construction of much of the route along the Greenway.

There is political support for the rapid transit but the EWAY route is contentious.[5][6] A campaign group was formed to oppose EWAY using the Greenway and wants it rerouted along Upper Newtownards Road and increased public consultation.[7] In October 2011 it was announced that EWAY would not include the Comber Greenway in its route.[8]

References

  1. ^ 54°33′00″N 5°44′46″W / 54.550°N 5.746°W / 54.550; -5.746
  2. ^ "Roads Service complete new section of Comber Greenway". Northern Ireland Executive. 5 October 2007. Retrieved 7 March 2008.
  3. ^ "Dundonald Railway Station, Then and Now…". Archived from the original on 25 October 2008. Retrieved 31 May 2009.
  4. ^ "History – Belfast Urban Motorway & Westlink". Retrieved 31 May 2009.
  5. ^ "Cash for Comber Greenway despite proposals to tear it up". Belfast Telegraph. Independent News & Media. 28 May 2008. Retrieved 31 May 2009.
  6. ^ "MLA Purvis hits out at Comber Greenway proposal at Stormont". Belfast Telegraph. Independent News & Media. 15 October 2008. Retrieved 31 May 2009.
  7. ^ "Greenway to Stay". Archived from the original on 15 June 2009. Retrieved 31 May 2009.
  8. ^ "Comber Greenway busway plan dropped". BBC Online. 7 October 2011.

External links

This page was last edited on 18 December 2023, at 04:04
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.