To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Tararua Wind Farm

From Wikipedia, the free encyclopedia

Tararua Wind Farm
Map
CountryNew Zealand
LocationTararua Ranges, east of Palmerston North
Coordinates40°20′46″S 175°46′48″E / 40.34611°S 175.78000°E / -40.34611; 175.78000
StatusOperational
Commission date1999 (stage 1)
2004 (stage 2)
2007 (stage 3)
Owner(s)Mercury NZ Ltd
Wind farm
TypeOnshore
Rotor diameter47m (V47)
90m (V90)
Site area700ha
Power generation
Make and modelV47 (103 turbines)
V90-3MW (31 turbines)
Nameplate capacity161 MW
External links
CommonsRelated media on Commons

The Tararua Wind Farm is a wind farm owned and operated by Mercury NZ Ltd. It is located on 700ha of farmland on the Tararua Ranges of New Zealand. It has become New Zealand's largest capacity wind farm, with a total capacity of 161MW.[1][2]

The wind farm was first commissioned in 1999 and has been upgraded twice since. The most recent addition was commissioned in September 2007.

The wind farm consists of 134 turbines of two different types:

  • 103 Vestas V47 turbines, each rated at 660 kW, with three 23.5m long blades.[3] Each turbine is mounted on a 40m high steel lattice tower.[1]
  • 31 Vestas V90-3MW turbines, each rated at 3 MW with three 45m long blades.[2]

The V47 turbines connect into Powerco's Palmerston North distribution network via twin 33,000-volt lines.[4] The V90 turbines connect into Transpower's national grid via a tee off one circuit of the Bunnythorpe to Linton 220,000-volt transmission line.[5]

On 6 October 2021, one of the V90 turbines caught fire. Five turbines in the same cluster were taken out of service due to the fire.[6]

YouTube Encyclopedic

  • 1/3
    Views:
    408
    379
    2 837
  • Helicopter at the Tararua Wind Farm.
  • Windfarm Turbine Experience.
  • Te Rere Hau Wind Farm (and crazy sheep)

Transcription

See also

References

  1. ^ a b "Tararua Wind Farm Stages 1 & 2". Tilt Renewables. Retrieved 24 June 2018.
  2. ^ a b "Tararua Wind Farm Stage 3". Tilt Renewables. Retrieved 24 June 2018.
  3. ^ TrustPower Celebrates New Wind Farm High Scoop, 13 September 2007
  4. ^ "Powerco CPP – Portfolio Overview Document –Palmerston North CBD Reinforcement" (PDF). Commerce Commission. 15 November 2017. Retrieved 6 October 2021.
  5. ^ "Transmission Planning Report 2021" (PDF). Transpower New Zealand. 1 October 2021. Retrieved 6 October 2021.
  6. ^ Rankin, Janine (6 October 2021). "Operators probe cause of wind turbine fire on Tararua Range". Stuff. Retrieved 6 October 2021.


This page was last edited on 13 April 2024, at 05:54
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.