To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Sydney Metro Metropolis Stock

From Wikipedia, the free encyclopedia

Sydney Metro Metropolis Stock
Alstom Metropolis at Chatswood station
Interior of Alstom Metropolis
In service2019–present
ManufacturerAlstom
DesignerXavier Allard[1]
Built atSri City, Andhra Pradesh, India
Family nameMetropolis
Constructed
  • 2016–2018 (first batch)[2]
  • 2019– (second batch)
Entered service26 May 2019 (2019-05-26)
Number under construction4 sets[3]
Number built41 sets[3]
Number in service26 sets[3]
Formation6 car sets
TC–MPC–MC–MC–MPC–TC[4]
Fleet numbers01 – 22 (first batch)
23 – 45 (second batch)
OperatorsMetro Trains Sydney
Depots
Lines served North West
Specifications
Car body constructionStainless steel
Train length121.5 m (398 ft 7+1532 in)
Car length20.25 m (66 ft 5+14 in)
Width3,035 mm (9 ft 11+12 in)
Height~3.7 m (12 ft 1+1116 in)
Doors3 per side
Maximum speed
  • 120 km/h (75 mph) (design)
  • 100 km/h (62 mph) (service)
Weight240 t (240 long tons; 260 short tons)[5]
Traction systemAlstom OPTONIX 2-level IGBTVVVF[4]
Traction motors16 × Alstom 4-ECA-2120 200 kW (270 hp) 3-phase AC induction motor[4][6]
Power output3.2 MW (4,300 hp)
Electric system(s)1,500 V DC (nominal) from overhead catenary
Current collector(s)Pantograph
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Braking system(s)Electro-pneumatic
Safety system(s)Alstom Urbalis 400 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI[4]
Coupling systemDellner
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Sydney Metro Metropolis Stock is a class of electric multiple units that operate on the Sydney Metro network. Built by Alstom as part of their Metropolis family, the trains are the first fully automated passenger rolling stock in Australia as well as the first single-deck trainsets to operate in Sydney since their withdrawal from the suburban rail network in the 1990s. A total of 176 carriages, making up 22 6-car sets, entered service in 2019 with the opening of the Metro North West Line. 23 more sets are gradually being rolled out for the City & Southwest extension, to commence service in 2024, expanding the Metropolis fleet to 45 sets.

YouTube Encyclopedic

  • 1/4
    Views:
    6 741
    8 291
    29 506
    4 322
  • Alstom Metropolis : Continuously improved to serve the cities
  • Sydney Central Station Upgrade - Central Walk, Metro Concourse, Chalmers Street Entrance Aug-Oct 22
  • DART+ : Alstom to provide the most sustainable fleet of trains in Irish transport history
  • Australia's leading railway solutions provider

Transcription

History

In June 2014, Northwest Rapid Transit (NRT), a consortium of Hong Kong-based MTR Corporation, John Holland, CPB Contractors, UGL Rail and Plenary Group, was selected by Transport for NSW to build and operate the North West Rail Link (later Sydney Metro North West) in a $3.7 billion public–private partnership.[7][8][9] The contract was formally awarded by the New South Wales Government in September 2014.[10] Northwest Rapid Transit contracted Alstom to build 22 6-car automated Metropolis trainsets for the line, as well as install a communications-based train control (CBTC) signalling system at a cost of $1.7 billion.[11][12]

In November 2015, the design of the train was unveiled by Minister for Transport Andrew Constance,[13] with the full-scale model of the train later displayed at public events such as the 2016 Sydney Royal Easter Show.[14][15] It consisted of the front carriage, and was approximately 75% of the length of the final design, having two doors instead of three.[16]

The trains were manufactured at Alstom's rolling stock facility at Sri City in India,[17][18] with the first train arriving in New South Wales in September 2017.[19][20] In February 2018, dynamic testing on the first of the trainsets began.[21] Testing was done on brakes, passenger information displays, lighting and door operation.[22] In July 2018, Alstom was awarded a 15 year maintenance contract for the trains and the signalling system.[23] In December 2018, production of the 22 trainsets was completed.[24] On 14 January 2019, the first driverless Metro train completed the full journey between Tallawong and Chatswood.[25]

On 26 May 2019, the trains entered service on the Metro North West Line,[26] operated by Metro Trains Sydney, a joint venture between the MTR Corporation, John Holland and UGL Rail.[9]

In November 2019, the Northwest Rapid Transit public–private partnership was extended to cover the City & Southwest extension. As part of this contract expansion, Alstom would deliver an additional 23 6-car trainsets as well as signalling to serve the extension at a cost of €350 million ($563 million).[27][28] The contract includes options for additional trains and extension of existing trains to 8 cars in length in future.[27][28] By November 2022, four of these additional trainsets had entered service on the Metro North West Line, ahead of the opening of the City & Southwest extension.[29] In March 2024, it was announced that all 45 trains had been tested over the full length of the line.[30]

The under construction Sydney Metro Western Sydney Airport line will not use the Metropolis sets, with trains ordered from Siemens.[31][32] As of April 2024, the rolling stock contract for Sydney Metro West has not been awarded.[31][33]

Design

Driving end of the train
Digital displays

Each single-deck train features two dedicated areas for prams, luggage and bicycles. There are three doorways per side per carriage and no internal gangway doors between the carriages.[34] In a 6-car configuration the trains have a seating capacity of 378 people, with a total capacity of 1,100.[35] The trains utilise Alstom's Urbalis 400 communications-based train control signalling system that ensures trains are capable of driving and operating automatically at all times without a driver or attendant on board, including door closing, obstacle detection and dealing with emergency situations.[36][37]

The trains feature longitudinal 'bench-style' seating per carriage (similar to most metro rapid-transit/subway trains), with distinctly coloured seats for priority and disabled passengers.[38] Seats in wheelchair spaces can fold up in order to fit prams and wheelchairs. A doorway-status light is installed above each doorway, which illuminates white when the doors are fully closed, green when the doors are fully open, and flashes in red when the doors are opening or closing.

Features of the Metropolis sets include CCTV cameras, internal passenger information display (PID) screens and digital voice announcements.[39] The PID screens display the name of the next station, along with icons for available transport mode interchanges. The sets are also fitted with air conditioning and emergency help points.[39] There are also USB charging ports at the end of cars 01 and 02.[40][41]

The Metropolis sets are operated via a control centre based at Rouse Hill. In the event the system is otherwise unable to operate the train, an engineer can manually take over the train's functions. The trains are maintained at the Sydney Metro Trains Facility at Rouse Hill,[42] with overnight stabling of trains at Sydney Metro Trains Facility South in Marrickville following the opening of the City & Southwest extension.[43]

Service formation

The 270 Alstom Metropolis carriages will form 45 six-car sets. Individual vehicles are numbered as follows:[citation needed]

Tallawong Chatswood
01
:
45
0101
:
4501
0103
:
4503
0105
:
4505
0106
:
4506
0104
:
4504
0102
:
4502
  • Cars 01 & 02 are control trailer cars.
  • Cars 03 & 04 are non-control motor cars with pantographs.
  • Cars 05 & 06 are non-control motor cars.

Car 01 always faces the Tallawong end, while car 02 always faces the Chatswood end.

In the event that extensions to 8 cars happens if sufficient demand warrants the contract, two infill carriages will be added between cars 05 and 06.

References

  1. ^ "Meet our chief train designer". Sydney Metro. Archived from the original on 26 October 2021. Retrieved 15 March 2023.
  2. ^ Upadhyay, Ankita; Collet, Coralie; Miller, Samuel (6 December 2018). "Alstom successfully delivers last train for Sydney Metro". Alstom. Archived from the original on 28 April 2023. Retrieved 29 April 2023.
  3. ^ a b c May, Tiana (3 November 2022). "Sydney Metro's New Driverless Trains Start Passenger Services". Railway News. Archived from the original on 25 April 2023. Retrieved 25 April 2023.
  4. ^ a b c d Jehan, David; Honan, Andrew (January 2016). Sydney Metro – Australia's first fully-automated rolling stock (PDF). Melbourne: Railway Technical Society of Australasia. ISBN 9781922107800. Archived from the original on 10 September 2021. Retrieved 10 September 2021.
  5. ^ Douglas, Neil; Thornton, Peter (2019). "Passenger Benefits of Sydney Metro" (PDF). Australasian Transport Research Forum. Archived (PDF) from the original on 5 September 2021. Retrieved 5 September 2021.
  6. ^ "Alstom Motors Catalogue 2015 – English" (PDF). Alstom. Archived from the original (PDF) on 27 June 2018. Retrieved 6 May 2021.
  7. ^ "Sydney automated metro operator selected". Metro Report International. 24 June 2014. Archived from the original on 24 March 2019. Retrieved 6 May 2019.
  8. ^ "Sydney's new train unveiled as $3.7 billion North West Rail Link operations contract signed". 16 September 2014.
  9. ^ a b "Sydney Metro Northwest | Transport | UGL Case Study". UGL. 29 June 2019. Archived from the original on 29 June 2019. Retrieved 10 April 2024.
  10. ^ "NRT awarded operations contract to deliver Australia's largest public transport project". Plenary Group. 16 September 2014. Archived from the original on 6 May 2019. Retrieved 6 May 2019.
  11. ^ "Alstom to deliver Australias first fully-automated rapid transit trains". Alstom. 17 September 2014. Retrieved 10 April 2024.
  12. ^ "Contract finalised for $3.7bn Sydney Metro extension". www.theconstructionindex.co.uk. 25 November 2019. Retrieved 10 April 2024. The consortium's AU$3.7bn (£1.95bn) contract package includes AU$1.7bn for new metro trains and core rail systems
  13. ^ "Alstom unveils railcar design for Sydney Metro". www.metro-magazine.com. 6 November 2015. Retrieved 10 April 2024.
  14. ^ "Check out the Sydney Metro train". Archived from the original on 2 September 2021. Retrieved 29 July 2017.
  15. ^ "Transport for NSW Sydney Metro Marquee at the Sydney Royal Easter Show 2016 - Proj-X Design". www.proj-x.com.au. Archived from the original on 28 March 2019. Retrieved 29 July 2017.
  16. ^ "First glimpse of new Metro train | Sydney Metro". www.sydneymetro.info. Archived from the original on 25 November 2020. Retrieved 30 July 2017.
  17. ^ "Sydney Metro Receives First Indian Built Alstom Train". The Metro Rail Guy. 28 September 2017. Archived from the original on 12 November 2020. Retrieved 30 March 2020.
  18. ^ "First metro trains arrive for new $8.3 billion line to Sydney's north west". Sydney Morning Herald. 26 September 2017. Archived from the original on 21 January 2018. Retrieved 20 January 2018.
  19. ^ "First Sydney Metro train arrives". NSW Government. 26 September 2017. Archived from the original on 12 February 2021. Retrieved 27 September 2017.
  20. ^ "Alstom delivers first fully automated metro trains to Sydney, Australia". Alstom. 19 March 2018. Retrieved 10 April 2024.
  21. ^ UK, DVV Media. "Sydney metro train on test". Metro Report. Archived from the original on 24 March 2019. Retrieved 11 February 2018.
  22. ^ "First Metro Train Testing | Sydney Metro". www.sydneymetro.info. Archived from the original on 31 July 2019. Retrieved 11 February 2018.
  23. ^ "Alstom awarded long term rolling stock and signalling maintenance contract for Sydney Metro". Alstom. 11 July 2018. Retrieved 10 April 2024.
  24. ^ "Alstom successfully delivers last train for Sydney Metro". Alstom. 6 December 2018. Retrieved 10 April 2024.
  25. ^ "Major Milestone As Metro Northwest Completes Its First Full Test". Transport for NSW. 14 January 2019. Retrieved 9 February 2021.
  26. ^ "Sydney's driverless Metro train line opens, but the doors don't". ABC News. 26 May 2019. Retrieved 10 April 2024.
  27. ^ a b "Operations and fleet contract awarded for Sydney Metro extension". International Railway Journal. 23 November 2019. Archived from the original on 31 August 2020. Retrieved 2 June 2020.
  28. ^ a b "Alstom to supply driverless trains and digital signalling system for Sydney Metro extension to City and Southwest". Alstom. 22 November 2019. Retrieved 10 April 2024. Under the contract, valued at approx. €350 million, Alstom will be responsible for the project management, design, supply, manufacturing, testing and commissioning of 23 six-car fully-automated Metropolis trains and the Urbalis 400 Communication Based Train Control (CBTC) signalling system.
  29. ^ Artymiuk, Simon (7 November 2022). "First driverless trains for Sydney City and Southwest Line enter service". International Railway Journal. Retrieved 10 April 2022.
  30. ^ "All 45 Metro trains tested in new tunnels under the Sydney CBD". Transport for NSW. 14 March 2024. Retrieved 10 April 2024.
  31. ^ a b O'Sullivan, Matt (28 May 2023). "Why Sydney will end up with three incompatible metro train lines". The Sydney Morning Herald. Retrieved 10 April 2024.
  32. ^ Artymiuk, Simon (12 January 2023). "Siemens to supply driverless trains for Sydney Metro Western Airport line". International Railway Journal.
  33. ^ Chan, Ray (18 December 2023). "Contract shortlists for Sydney Metro West". Rail Express. Retrieved 11 April 2024.
  34. ^ "Case study: North West Rail Link, Sydney, Australia". Alstom. Archived from the original on 4 March 2016. Retrieved 14 October 2015.
  35. ^ O'Rourke, Jim (5 November 2015). "Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage". The Daily Telegraph. Retrieved 7 November 2015.
  36. ^ Douglas, Neil; Thornton, Peter (2019). "Passenger Benefits of Sydney Metro" (PDF). Australasian Transport Research Forum 2019 Proceedings. Archived (PDF) from the original on 5 September 2021. Retrieved 5 September 2021.
  37. ^ Johri, Pankaj; McGann, Timothy; Venn-Brown, David; Zou, Ren (2018). "Introducing Sydney's fully automated rolling stock". Conference On Railway Excellence 2018. Archived from the original on 8 March 2022. Retrieved 8 March 2022.
  38. ^ "Alstom's first 'Make in India' Metro inaugurated in Kochi". raillynews.com. 19 June 2017. Archived from the original on 21 January 2018. Retrieved 21 January 2018.
  39. ^ a b Acharya, Mosiqi (30 May 2019). "Australia's first fully-automated, driver-less trains are made in India". SBS Language. Retrieved 10 April 2024.
  40. ^ "Alstom Metropolis Trains". Railway Technology. Archived from the original on 27 January 2021. Retrieved 2 June 2020.
  41. ^ "Sydney Metro Trains Features & Design | Sydney Metro". www.sydneymetro.info. Archived from the original on 2 June 2020. Retrieved 2 June 2020.
  42. ^ "Trains Facility expansion | Sydney Metro". www.sydneymetro.info. Retrieved 10 April 2024.
  43. ^ "Marrickville Dive Site and Trains Facility South | Sydney Metro". www.sydneymetro.info. Retrieved 10 April 2024.

External links

This page was last edited on 11 April 2024, at 12:23
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.