To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Super Tokkyū (スーパー特急) is the name given to the concept of building new high-speed narrow gauge (1,067 mm (3 ft 6 in)) railway lines in Japan to extend the Shinkansen network of high-speed lines.[1]

No Super Tokkyū routes have actually been built.

Concept

The Super Tokkyū concept involves building new narrow-gauge lines along the routes of planned Shinkansen lines. All infrastructure would be built to high-speed Shinkansen standards, including its wider loading gauge, 4,000 m minimum curve radius, and total grade separation, with the ability to convert the lines to 1,435 mm (4 ft 8+12 in) standard gauge in the future. Although they would be slower than regular Shinkansen trains, they would have a speed of more than 200 km/h (120 mph) , enabling some reductions in journey times to be achieved, and total construction expenditure could be spread over a longer period, with travel times gradually reduced as more sections are completed.[1]

The ultimate goal is eventual conversion to standard-gauge Shinkansen track once the entire line is completed, but with gauge change trains (GCTs), it may be possible in the future to upgrade these sections to full Shinkansen specifications even while inter-operation with conventional lines remains in place.

Proposals

In 1991, the Super Tokkyū concept was formally planned to be used as part of the following three Shinkansen extensions:[1]

These schemes were subsequently constructed to full Shinkansen specification lines.

The West Kyushu Shinkansen route to Nagasaki was also initially proposed as a Super Tokkyū line from Takeo-Onsen. However, after construction commenced the proposal changed to incorporate GCTs, resulting in the Takeo Onsen to Nagasaki section (due to open in March 2023) being constructed as standard gauge lines. The service is proposed by GCTs using the Hakata to Shin-Tosu section of the Kyushu Shinkansen, then the narrow gauge line to Takeo Onsen, then the new West Kyushu Shinkansen line for the final section of the trip.[3]

See also

  • Gauge Change Train, an experimental train designed to operate on both narrow-gauge and standard-gauge routes
  • Mini-shinkansen, the concept of converting narrow-gauge lines to standard gauge for use by Shinkansen trains

References

  1. ^ a b c Semmens, Peter (1997). High Speed in Japan: Shinkansen - The World's Busiest High-speed Railway. Sheffield, UK: Platform 5 Publishing. ISBN 1-872524-88-5.
  2. ^ 北陸新新幹線のあゆみと課題. Retrieved on 11 February 2009. (in Japanese)
  3. ^ 九州新幹線西九州ルート(長崎ルート) (Kyushu Shinkansen West (Nagasaki) Route). Retrieved on 11 February 2009. (in Japanese)
This page was last edited on 25 July 2023, at 06:41
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.