To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Summit Avenue station (MBTA Green Line C branch)

From Wikipedia, the free encyclopedia

Summit Avenue
Two trains at Summit Avenue station in 2012
General information
LocationBeacon Street and Summit Avenue
Brookline, Massachusetts
Coordinates42°20′27″N 71°07′31″W / 42.340946°N 71.125182°W / 42.340946; -71.125182
Platforms2 side platforms
Tracks2
History
Previous namesWinchester Street
Passengers
2011945 (weekday average boardings)[1]
Services
Preceding station MBTA Following station
Brandon Hall Green Line Coolidge Corner
Location
Map

Summit Avenue station (announced as Winchester Street/Summit Avenue) is a light rail stop on the MBTA Green Line C branch, located in the median of Beacon Street between Winchester Street and Summit Avenue in the Coolidge Corner neighborhood of Brookline, Massachusetts. The stop has two low side platforms that serve the line's two tracks; it is not accessible.

YouTube Encyclopedic

  • 1/2
    Views:
    94 303
    89 547
  • MBTA GLX! May 2021 Green Line Extension Construction Update!
  • Boston's T Network Evolution

Transcription

History

Until around 2004, the station was listed as Winchester Street to avoid confusion with Summit Avenue stop on the B branch.[2] The B branch stop was closed as part of a pilot program in April 2004 (after which the C branch stop became Summit Avenue) and permanently closed the following March.[3][4][5]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[6] Design work for Summit Avenue and seven other C Branch stations was 15% complete by December 2022.[7] As of November 2023, construction is expected to take place from mid-2025 to spring 2026.[8] Designs shown in February 2024 called for the platforms to be shifted eastward, with access from both Winchester Street and Summit Avenue.[9] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Summit Avenue.[10]

References

  1. ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ^ "Green Line/Train C". Massachusetts Bay Transportation Authority. Archived from the original on April 4, 2004.
  3. ^ "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on November 26, 2010.
  4. ^ Daniel, Mac (16 March 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on March 18, 2005.
  5. ^ "Green Line/Train C". Massachusetts Bay Transportation Authority. Archived from the original on June 3, 2004.
  6. ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  7. ^ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  8. ^ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. pp. 4–5.
  9. ^ "Green Line C Branch Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. February 15, 2024.
  10. ^

External links

Media related to Summit Avenue station (MBTA Green Line C branch) at Wikimedia Commons

This page was last edited on 30 May 2024, at 23:59
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.