To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Slate operations on the Welsh Highland Railway

From Wikipedia, the free encyclopedia

The original Welsh Highland Railway (WHR) owed its existence to the narrow gauge railways and tramways built to serve commercial slate traffic from slate quarries and other mineral extraction operations along its route.

During the first world war as well as slate other materials such as timber were carried by the North Wales Narrow Gauge Railways, the precursor of the northern half of the Welsh Highland Railway, from the Beddgelert Forest extension. One of the more recent proposals for the re-opened WHR is to again carry timber from the Forestry Commission operation in Beddgelert Forest where the line runs through.[1]

YouTube Encyclopedic

  • 1/5
    Views:
    33 564
    4 621
    5 565
    962
    2 683
  • Railway With A Heart Of Gold - circa 1960 Talyllyn Narrow Gauge Slate Railway Trains - Ella73TV
  • Footplate (cab) ride Linda Part 3: Blaenau Ffestiniog to Porthmadog 31 May 1994
  • Railway with a Heart of Gold (1965)
  • Welsh Highland Heritage Railway Gala May 2009
  • Mountaineer ALCO built 1916 in action 1998 & 2000

Transcription

Tramways and railways serving the slate industry

Croesor Tramway

The Croesor Tramway was built to take slate traffic from the Croesor and New Rhosydd quarries. The Croesor tramway had run from Portmadoc since 1863 up into the Croesor Valley to serve the slate quarries in this area. This was a horse worked line laid to a nominal 2 foot gauge. The section of WHR track which was re-opened in 2009/2010 between Pont Croesor and Porthmadog follows the original trackbed of the tramway.

North Wales Narrow Gauge Railways

The main line of the North Wales Narrow Gauge Railways was built to serve the following quarries:[2]

  • Alexandra Quarry
  • Moel Tryfan Quarry
  • Braich
  • Y Fron
  • Cilgwyn

The railway was then extended by a branch from Tryfan Junction to connect with the Hafod-y-Wern quarry branch and Glanrafon where there were sidings.

References

  1. ^ "Welsh Highland Railway". Archived from the original on 8 September 2004.
  2. ^ Fisher, Ben (8 August 2007). "The Route of the Welsh Highland Railway - The Bryngwyn Branch". Archived from the original on 19 April 2008.

This page was last edited on 22 June 2022, at 16:40
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.