To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Schedule delay

From Wikipedia, the free encyclopedia

Schedule delay is a term in transport modelling which refers to a difference between a desired time of arrival or departure and the actual time. Despite the use of "delay", it can refer to a difference in either the early or late direction.

The most common example is that of having a fixed work start time: if someone starts work at 0900 but actually arrives at 0850, they are incurring a schedule delay of 10 minutes. Alternative examples might include public transport - if a bus is scheduled to depart from a stop at 20-minute intervals (e.g. 0800, 0820, 0840) and a person wishes to begin their journey between those intervals (e.g. at 0815), they incur a schedule delay through having to retime their departure from the desired 0815 point to the bus departure time of 0820.

Schedule delay can be measured as a utility (or, rather, a disutility). The Small model of scheduling has the disutility of schedule delay decrease linearly towards zero as the actual arrival (or departure) time approaches the desired time. The disutility of schedule delay for a late arrival or departure also increase linearly, but Small hypothesises that there can also be a fixed penalty component of schedule delay on the "late" side - e.g. arriving late for work is always bad, even if it is only slightly late.

YouTube Encyclopedic

  • 1/1
    Views:
    2 776
  • Introduction to Schedule Risk Analysis

Transcription

See also

References

This page was last edited on 16 March 2019, at 15:09
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.