To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

PO E.1 to E.80
SNCF BB 1 to BB 80
E-BB 36 preserved in Cité du Train, Mulhouse
Type and origin
Power typeElectric
BuilderSEECF
Serial numberSchneider 5011–5090
Build date1924–1928
Total produced80
Specifications
Configuration:
 • CommonwealthBo-Bo
Gauge1,435 mm (4 ft 8+12 in) standard gauge
Wheel diameter1,250 mm (49+14 in)
Length12.690 m (41 ft 7+12 in)
Loco weight72 tonnes (71 long tons; 79 short tons)
Power supply1500 V DC
Electric system/sCatenary/3rd rail
Current pickup(s)Pantograph/Contact shoe
Traction motors4 x GE276
MU workingYes
Performance figures
Maximum speed90 km/h (56 mph)
Power output:
 • 1 hour1,236 kW (1,658 hp)
 • Continuous972 kW (1,303 hp)
Career
Operators
Numbers
  • PO/PO-Midi: E-BB 1 to E-BB 80
  • SNCF: BB 1 to BB 80
NicknamesBiquettes
Retired1944 (5), 1969–1980
PreservedE.36
DispositionOne preserved, reminder srapped

The BB 1 to 80 are electric locomotives of the former Paris-Orléans company, taken over by the SNCF at its creation in 1938.

This class was one of a group of four, altogether totalling 200 locomotives for mixed traffic use, ordered by the Orléans network during the electrification of the Paris - Vierzon line; they were put into service between 1924 and 1928. Later, some of these locomotives operated various services at the head of passenger trains, in push-pull mode, in the south-eastern suburbs of Paris. They were also used for freight trains, which were better suited to their technical characteristics. In the 1960s and 1970s, around twenty of them were modified to run as permanently coupled double units on the Maurienne line, then electrified on the third rail. The class was withdrawn between 1969 and 1980, except for seven locomotives destroyed in 1944 by Allied bombardments of the depots where they were stabled.

YouTube Encyclopedic

  • 1/5
    Views:
    319
    16 399
    375 522
    22 301
    89 577
  • ED80 Air-Spaced Triplet Unboxing - Explore Scientific
  • Tolles Spur 1-Modellbahn-Modul in 1:32 – Impressionen, Interview mit Jürgen Peters, Mannheimer Norm
  • Clock Aptitude Reasoning Tricks & Problems - Finding Angle Between The Hands of a Clock Given Time
  • 46 Comprendre la carte mère 2
  • Converting Hours to Seconds and Seconds to Hours

Transcription

Design and construction

Between 1900 and 1917, French railway companies carried out line electrification on their networks, either by third rail or by catenary, with various types of current (direct, single-phase alternating, at various voltages and/or frequencies). On 29 August 1920, a ministerial decision standardised on 1.5 kV DC for all new lines. Those already electrified had to adopt the new standard.[1]

It was within this framework that the PO company undertook, in 1920, the electrification of the Paris-Vierzon line, completed in 1926. To operate the line it placed an order for 200 locomotives, capable of hauling both passenger and goods trains, divided into four classes. Among them were the 80 locomotives, then numbered E-BB 1 to E-BB 80.[1]

The locomotives were built by SEECF, the research company for railway electrification. This company, created in 1920, brought together French manufacturers, such as Schneider and Jeumont, and American companies, such as Thomson-Houston, which held General Electric patents.[2]

Simplified diagram of BB 37 in its SNCF configuration

Mechanically, the E-BB 1-80 were developed from Etat Z 6001-6030 locomotives. Their electrical equipment was directly adapted from American technology.[1] The locomotives were 12.690 m (41 ft 7.6 in) long and consisted of a single body attached to the frame. The chassis consists of two BB type bogies, each with two General Electric GE 276 traction motors. The suspension used leaf and helix springs.[3] The electro-pneumatic equipment was supplied by Westinghouse.[1] Current collection was principally by pantograph, though a number of locomotives were also equipped with contact shoes for operation on third rail. The weight in running order of the locomotive was 72 t (71 long tons; 79 short tons); the continuous power rating was 972 kW (1,303 hp), with a one-hour rating of 1,236 kW (1,658 hp).[4] The whole class was equipped to operate in multiple; for this purpose, in addition to the connection and cabling equipment, cab end doors allowed passage from one locomotive to another while running.[1] In the body, the electrical equipment, protected by wire mesh panels, was placed on either side of the central corridor which connected the two driving cabins.[3]

Operational history

The first four machines were delivered in 1924, the last in 1928.[1]

Towards Brive and Bordeaux

When the first 21 locomotives were delivered, the electrification of the Paris-Vierzon line hadn't been completed so, as an interim measure, they were temporarily fitted with contact shoes to operate the third rail suburban services between Gare d'Orsay and Juvisy.[5] It was not until 22 December 1926 that the Paris-Vierzon line was fully electrified by catenary.[6] The E-BB 1-80 were then put to intensive use, the first locomotives delivered gradually losing their contact shoe equipment. They had a tendency to rear up at start-up, which earned them their nickname "biquettes" (kids).[7] However, their maximum speed of 90 km/h (56 mph), (attempts to raise their speed limit to 105 km/h (65 mph) did not succeed)[8] and their lack of power proved a handicap to them when rostered on passenger trains, for lack of a sufficient fleet of dedicated passenger locomotives; they were more efficient in hauling freight trains.[9] Initially they suffered from a number of teething problems, the traction motors being insufficiently reliable and the Westinghouse equipment prone to numerous breakdowns; they were the subject of numerous modifications aimed at solving these problems.[10] As the electrification programme continued, however, they reached Tours in 1933 and Brive-la Gaillarde in 1935.[11]

When the SNCF was created in 1938, the locomotives, renumbered BB 1-80, were allocated to nine different depots.[12] In addition to their previous routes, they now operated services to Bordeaux. During the Second World War, in October 1943, they were re-allocated to the depots of Orleans, Tours-Saint-Pierre and Vierzon but the Allied bombardments in 1944 destroyed seven members of the class.,[13] two at Orleans, four at Tours-Saint-Pierre and one at Vierzon. Other's of the class were damaged, but were gradually repaired after the end of the conflict. [9]

On the south-eastern suburbs of Paris

BB 17 at the head of a train of wine tank wagons

By the end of World War II, the class was reduced to 73 locomotives. In 1950, some of them were allocated to the operation of push–pull trains in the south-eastern suburbs of Paris, departing from Gare de Lyon. To facilitate this, the control gear from the rear driver's cab was removed and installed in the pilot car at the other end of the train. Eighteen locomotives were thus modified and assigned to the Paris-Lyon depot.[14] Five years later, the delivery of new class Z 5100 electric multiple units to Paris-Lyon displaced the push-pull equipped locomotives which were sent to Lyon. In the southwest, the class operated almost exclusively at the head of freight trains to Vierzon or Tours.[15]

On the Maurienne line

From the end of the 1950s, the signing of the Treaty of Rome resulted in a sharp increase in Franco-Italian traffic on the Maurienne line. Reinforcements in third rail motive power were then necessary on this route. In the absence of other locomotives immediately available, recourse was made to BB 1-80 from the Lyon-Mouche depot which were made available by the arrival of more modern and more powerful BB 9400 locomotives. The BB 1-80s were adapted to run in permanently coupled pairs equipped with contact shoes at the outer ends. This arrangement allows the unit to be sufficiently long (25.380 m (83 ft 3.2 in)) to cross the gaps in the third rail at switches and crossings without interrupting the electrical supply. This resulted in a locomotive with a power output of nearly 2,000 kW (2,700 hp).[16][17]

The modifications were carried out on the locomotives at the workshops of Oullins and at the depot of Dole.[18] In addition to fitting contact shoes at both ends of the assembly, the work included fitting electronic control equipment and regenerative braking,[19] the removal of the two end pantographs and the shutdown of the cabs facing each other.[20] Between 1961 and 1968, eleven “Maurienne units” were thus set up and assigned to Chambéry depot.[16] Maurienne units operated alone or coupled in pairs or threes; making them very versatile. In 1976, the replacement of the third rail by overhead catenary on this line allowed all the direct current locomotives to operate there.[21] The aging Maurienne units were withdrawn in 1979,[22] their services being taken over by the more powerful BB 8100 locomotives recently transferred to Chambéry.[23]

Withdrawal

In later years BB 1-80s, excluding the Maurienne units, operated in the large south-eastern suburbs of Paris or were assigned to trip working between stations; a few freight trains were still allocated to them. Push-pull fitted locomotives still worked from Paris-Lyon to Laroche - Migennes.[24] The locomotives based in Villeneuve-Saint-Georges provided worker shuttles before being transferred to Lyon between 1970 and 1976.[25]

With the exception of the seven locomotives destroyed in 1944, the first withdrawals took place in 1969, the last in 1980.[8] Unmodified locomotives, those which were not push-pull fitted or Maurienne units, were the first to disappear by 1976. [26] Among them, BB 17, withdrawn from revenue service in 1971, served as a mobile laboratory for chopper equipment.[8]

Preservation

BB 36, withdrawn in 1973 from the Lyon-Mouche depot, was restored in the early 1980s, by the Brive workshops, to its original PO condition and numbered E-BB 36. It is now exhibited at the Cité du train in Mulhouse.[26]

References

  1. ^ a b c d e f Collardey 1995, p. 26.
  2. ^ Étienne Auphan (2017). Paris-Bordeaux by train - the three stages of modern railways 1844-2016. Presses universitaire du Septentrion. p. 54. ISBN 978-2-7574-1463-7.
  3. ^ a b Didelot 2014, p. 34.
  4. ^ Didelot 2014, p. 35.
  5. ^ Didelot 2014, p. 38.
  6. ^ Étienne Auphan (2017). Paris-Bordeaux by train - the three stages of modern railways 1844-2016. Presses universitaire du Septentrion. p. 98. ISBN 978-2-7574-1463-7.
  7. ^ Didelot 2014, p. 33.
  8. ^ a b c Collardey 1995, p. 33.
  9. ^ a b Didelot 2014, p. 39.
  10. ^ Didelot 2014, p. 32.
  11. ^ Collardey 1995, p. 27.
  12. ^ Collardey 1995, p. 27-29.
  13. ^ Collardey 1995, p. 29.
  14. ^ Collardey 1995, p. 29-30.
  15. ^ Collardey 1995, p. 30.
  16. ^ a b Collardey 1995, p. 30-32.
  17. ^ Didelot 2014, p. 50.
  18. ^ Didelot 2014, p. 53.
  19. ^ Didelot 2014, p. 36.
  20. ^ Andreu 2006, p. 29.
  21. ^ Morel 2006, p. 22.
  22. ^ Collardey 1995, p. 32-33.
  23. ^ Morel 2006, p. 28.
  24. ^ Collardey 1995, p. 32.
  25. ^ Didelot 2014, p. 49.
  26. ^ a b Didelot 2014, p. 44.

Bibliography

  • Andreu, Jacques (July 2006). "À bord de la dernière "unité Maurienne"". Objectif Rail (16): 29–31.
  • Collardey, Bernard (November 1995). "De la banlieue à la montagne : la saga des BB 1 à 80". Voies ferrées (92): 22–33.
  • Davies, John. Chemins de fer du Midi and Chemins de fer de Paris à Orleans Locomotive List 1840–1938. Woodbridge, Queensland: Dr. John Davies. pp. 196–197. ISBN 0-9585541-0-2.
  • Defrance, Jacques (1978) [1969]. Le matériel moteur de la SNCF (réédition 1978 ed.). La Vie du rail.
  • Didelot, Frédéric (September 2014). "BB 1 à 80 : vénérables "biquettes" du Paris-Orléans". Ferrovissime: 30–53.
  • Morel, Philippe (July 2006). "Le 3e rail décroche en Maurienne". Objectif Rail (16): 20–28.
This page was last edited on 15 August 2023, at 21:20
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.