To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Rishikesh–Karnaprayag line

From Wikipedia, the free encyclopedia

Rishikesh–Karnaprayag line
Overview
StatusUnder construction
OwnerRail Vikas Nigam
LocaleUttarakhand
Termini
Stations12
Websitehttp://www.indianrailways.gov.in
Service
SystemBroad gauge
ServicesSingle track
Operator(s)Indian Railways
Technical
Line length126 km (78 mi)
Track length126 km (78 mi)
Track gauge1,676 mm (5 ft 6 in)
Minimum radius440 m (1,440 ft)
Electrification25 kV 50 Hz AC OHE
Operating speed100 km/h (62 mph)
Highest elevation1,451 m (4,760 ft)
Route map

0
Karnaprayag
9
Ghauchar
15
Gholtir
28
Rudraprayag
37
Dhari
51
Srinagar Garhwal
56
Kirtinagar
78
Devaprayag
93
Sakni
105
Manjilgaon
112
Shivpuri
Chandrabhaga River
130
Yog Nagari Rishikesh
to Laksar–Dehradun line

The Rishikesh–Karnaprayag line is an under-construction railway line, which will run from Yog Nagari Rishikesh railway station in Rishikesh to Karnaprayag. It is Indian Railways' proposed route for the Char Dham Railway to connect the Char Dham pilgrimage of Uttarakhand. The line is also part of an Indian geostrategic initiative to build infrastructure along the India-China border to discourage Chinese expansion.[1][2] The project is considered to be of national strategic importance and is being tracked on the Central Government’s PRAGATI (Pro Active Governance and Timely Implementation) portal. When ready, it will help improve connectivity to the Char Dham shrines of Yamunotri, Gangotri, Badrinath and Kedarnath in the Garhwal region of the Himalayas in Uttarakhand.

YouTube Encyclopedic

  • 1/5
    Views:
    6 782
    6 330
    974
    6 213
    2 211
  • Rishikesh- Karnaprayag Railway Project || New Update || 29th March 2024 || Chardham Rail Project
  • Rishikesh- Karnaprayag Railway Project || New Update || 27th February 2024 || Chardham Rail Project
  • Rishikesh- Karnaprayag Railway Project || New Update || 12th April 2024 || Chardham Rail Project ||
  • Rishikesh- Karnaprayag Railway Project || New Update || 03 February 2024 || Chardham Rail Project
  • Rishikesh- Karnaprayag Railway Project || New Update || 11th February 2024 || Chardham Rail Project

Transcription

Project

Satpal Maharaj began a survey for the project as Minister of Railways of Uttarakhand in 1996.[3][4][5] The project received funding and other authorisations from the government; it was reportedly India's longest tunnel-rail project, which would play a vital role in national security and the welfare of Uttarakhand.[6]

The line will serve pilgrims and local residents, and will be able to rapidly move troops to the India-China border.[7] The project's foundation stone was scheduled to be laid by United Progressive Alliance chairperson Sonia Gandhi on 9 November 2011. [8] Alignment of the 126-kilometer-long railway project was completed in 2013,[9] but the project was delayed by political wrangling.[10] The work began finally in 2015 under the leadership of Narendra Modi led National Democratic Alliance government.

Route

The Rishikesh railway station (RKSH) is in the city, and the railway line could not be extended through densely-populated areas. A rail line was built from the Virbhadra station to the new Yog Nagari Rishikesh railway station (YNRK), built in 2020. The Rishikesh–Karnaprayag route begins at Yog Nagari Rishikesh (385 m AMSL) and ends at Karnaprayag (825 m AMSL).[11] The ₹16,200 crore project will reduce travel time between Rishikesh and Karnaprayag from 6-7 hours to 2+12 hours. It was planned to cross 16 bridges, and 105 km (85 percent) will run through tunnels. A 15.1-km tunnel, reportedly India's longest, will be built between Devprayag and Lachmoli.[11]

According to a letter to the Uttarakhand government from RVNL, stations will include Yog Nagari Rishikesh in Rishikesh, Dehradun district, Srinagar, Tehri, Shivpuri and Byasi in Tehri district, Devprayag and Dungripanth (Dhari devi) in Pauri, Rudraprayag and Gholtir in Rudraprayag district, and Gaucher and Karanprayag in Chamoli district. The line will have 12 stations, 17 tunnels and 35 bridges, and is expected to be completed by 2024-25.[citation needed]

Status

Design contracts for tunnel and bridge construction were awarded in 2019. Italferr, the engineering arm of FS Italiane Group, received the contract for the design and supervision of the 12-km-long section (running almost entirely through tunnels) of the Himalaya Tunnel as part of a joint venture with Swiss firm Lombardi SA.[12] That construction began in 2019. Work on the first block section, from the Virbhadra railway station to Yog Nagari Rishikesh, began in June 2018 and was completed in 2020.

See also

References

  1. ^ Dangwal, Sandhya (12 May 2017). "Chardham to get rail connectivity; Indian Railways pilgrimage linking project to cost Rs 43.29 crore". India.com. Retrieved 30 May 2017.
  2. ^ "Railway minister lays foundation stone for final location survey on char dham route". The Times of India. Retrieved 30 May 2017.
  3. ^ "Railway Ministers". IRFCA. Retrieved 6 April 2016.
  4. ^ "Several Rail Projects Yet To Take Off in State".
  5. ^ "Rishikesh Karnprayag Project". Tribune India. Retrieved 6 April 2016.
  6. ^ "Coming soon: India's longest railway tunnel on Rishikesh-Karnprayag route". Hindustan Times. Retrieved 21 September 2016.
  7. ^ "Rishikesh-Karanprayag rail line priority project: MP". Tribune India. Retrieved 6 April 2016.
  8. ^ "Work on Rishikesh-Karnaprayag rail line to commence soon: Satpal Maharaj". meri news. Retrieved 6 April 2016. {{cite journal}}: Cite journal requires |journal= (help)
  9. ^ "Alignment plan finalized for Rishikesh-Karnaprayag railway line". Zee News. 14 September 2013. Retrieved 6 April 2016. {{cite journal}}: Cite journal requires |journal= (help)
  10. ^ Prashant, Shishir (14 March 2014). "Rail project caught in unsavory political controversy". Business Standard India. business-standard. Retrieved 6 April 2016.
  11. ^ a b "Coming soon: India's longest railway tunnel on Rishikesh–Karnaprayag route". Hindustan Times. 19 September 2016. Retrieved 30 May 2017.
  12. ^ "Italferr is awarded a new contract in India". www.italferr.it. Retrieved 15 December 2019.
This page was last edited on 13 April 2024, at 10:46
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.