To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Reusens Dam
Location of Reusens Dam in Virginia
LocationAmherst County, Virginia, U.S.
Coordinates37°27′47.68″N 79°11′10.44″W / 37.4632444°N 79.1862333°W / 37.4632444; -79.1862333
PurposePower
StatusIn use
Opening date1903
Owner(s)Eagle Creek Renewable Energy
Operator(s)Eagle Creek Renewable Energy
Dam and spillways
Type of damConcrete gravity and concrete arch
ImpoundsJames River
Height24 feet
Length416 feet
Power Station
Operator(s)Eagle Creek Renewable Energy
Turbines5
Installed capacity12.5 MW

The Reusens Dam is a 12.5 MW[1] hydroelectric generation facility on the James River near the city of Lynchburg, Virginia, United States. The project includes a concrete gravity dam spanning the left side of river which incorporates eight 16 3/4-foot-high flood gates, a 125 feet long by 25 feet tall concrete arch dam segment with 7 1/4-foot-high flashboards, and two separate power houses towards the right bank which contain hydroelectric generation equipment. The A and B power houses have installed capacities of 7.5 MW with three turbines and 5.0 MW with two turbines, respectively. The plant is used in a peaking capacity.[2] The dam is located downstream of the smaller Holcomb Rock Dam and upstream of the Scotts Mill Dam. The typically submerged Bosher Dam near Richmond lies further downstream.[3]

During the year ending September 30, 2014, the project did not produce any electricity.[4]

YouTube Encyclopedic

  • 1/1
    Views:
    1 166
  • Dr Jim Best Kept Secret In Virginia

Transcription

References

  1. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2016-03-05. Retrieved 2015-08-29.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ US Army Corps of Engineers National Inventory of Dams, NIDID VA08701
  3. ^ Order issuing Appalachian Power Co new lic re Resusens Proj under P-2376. FERC Ascension Number 19940329-0351. FERC Project Number P-2376. March 18, 1994
  4. ^ Appalachian Power Company submits their Statement of Generation during the period 10/1/13 through 9/20/14 for the Claytor Project et al under P-739 et al. FERC Ascension Number 20141103-0049. FERC Project Number P-2376. October 23, 2014.
This page was last edited on 31 March 2024, at 11:15
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.