To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Rennes Metro
Overview
Native nameMétro de Rennes
OwnerRennes Métropole
LocaleRennes, Brittany, France
Transit typeRubber-tyred metro
Number of lines2
Number of stations28
Daily ridershipLine A: 145,000 (2023)
Line B: 80,000 (2023)
Annual ridership42.02 million (2022)
HeadquartersRennes
Websitewww.star.fr
www.metro-rennes-metropole.fr
www.star2022.fr
Operation
Began operation15 March 2002; 22 years ago (15 March 2002)
Operator(s)Service des Transports en Commun de l'Agglomération Rennaise (STAR)
Number of vehicles55
Technical
System length22.4 km (13.9 mi)
Track gaugeRubber-tyred, no conventional track[1]
Average speed32 km/h (20 mph)
Top speed80 km/h (50 mph)

The Rennes Metro (French: Métro de Rennes) (Breton: Metro Roazhon) is a light metro system serving the city of Rennes in Brittany, France. Opened on 19 March 2002, it made Rennes the smallest city in the world to have a metro system from 2002 to 2008.[2]

Currently the system contains two lines, Line A and B. It has 28 stations and stretches 23.5 kilometres (14.6 mi), with the majority of its route underground. Line A connects the quarter of Villejean to the quarter of Poterie, passing the city center. It is based on the Siemens VAL (véhicule automatique léger or light automatic vehicle in English) technology. In 2023, approximately 145,000 trips a day were made on Line A, and 80,000 on Line B.[3]

A second line, Line B, is opened on 20 September 2022.[4] Running north-east to south-west between Cesson-Sévigné and Saint-Jacques-de-la-Lande, it also has 15 stations, two of them interchangeable with Line A, forming an x-shaped network. It will be the first metro line in the world to use the NeoVal technology. Originally planned to open in 2020, the line suffered multiple delays, mainly due to the COVID-19 pandemic. After the opening of Line B, Rennes became the smallest city with two metro lines.

YouTube Encyclopedic

  • 1/5
    Views:
    1 519
    6 463
    4 071
    1 323
    18 090
  • World Metro Systems: Rennes Metro
  • [ Video Metro ] RENNES MÉTRO - NOUVELLE LIGNE B - LE NOUVEAU MÉTRO EST LA !
  • Metro b Rennes - Saint-Germain
  • Metro Rennes Ligne a - Le Blosne
  • Metro, Rennes | French Public Transport

Transcription

History

During the 1960s, Henri Fréville (the Mayor of Rennes) discussed the return of the city's tramway which had been dissolved by the Mayor's predecessor, Yves Milon. However, the former tramway was disliked due to it being out of tune with the car-centric mentality of the city. When Charles de Gaulle visited Rennes on 31 March 1969, he remarked to Henri Fréville, "When you have a million inhabitants, you can have your metro."

The planning document underpinning urban transport structure (plan de déplacements urbains) in Rennes underwent a redesign which began in September 1984. This redesign was brought about by Mayor Edmond Hervé, who sought to ease congestion and reduce its future risk by remapping the city centre.

Between June and September 1986, SITCAR conducted the first studies considering the creation of a public transport system, separated from road traffic, for Rennes in response to the continued increases in passenger frequency. Several studies were to be conducted considering two different modes of transport: tramway and light railway.

  • 1986: City Council decides to create a transport line on a north-western/south-eastern axis.
  • 1989: The municipality decides to use VAL technology.
  • 1992: The A Line project receives planning and environmental approvals.
  • 1997: Beginning of work on Line A.
  • 2002: Opening of Line A.
  • 2005: Three park-and-ride lots were set up
  • 2006: Creation of Korrigo card
  • 2007: City Council decides to create a second metro line (B)
  • 2010: The municipality decides to use CityVal technology.
  • 2011: The B Line project receives planning and environmental approvals.
  • 2014: Beginning of work on Line B
  • 2022: Opening of Line B
Station Lige(s) Inauguration Date [5] · [6] Situation District
(Quartier)
Anatole France
Anatole France
15 3 2002 Deep
Underground
Rennes
(La Touche)
Atalante
Atalante
20 9 2022 Overground Cesson-Sévigné
(Campagne Nord / Via Silva)
Beaulieu - Université
Beaulieu - Université
20 9 2022 Overground Rennes
(Beaulieu)
Cesson - Viasilva
Cesson - Viasilva
20 9 2022 Overground Cesson-Sévigné
(Campagne Nord / Via Silva)
Charles de Gaulle
Charles de Gaulle
15 3 2002 Deep
Underground
Rennes
(Colombier - Champ-de-Mars)
Clemenceau
Clemenceau
15 3 2002 Underground Rennes
(La Binquenais)
Cleunay
Cleunay
20 9 2022 Deep
Underground
Rennes
(Cleunay)
Colombier
Colombier
20 9 2022 Deep
Underground
Rennes
(Colombier - Champ-de-Mars)
Gares
Gares
 : 15 3 2002
 : 20 9 2022
Deep
Underground
Rennes
(Saint-Hélier)
Gros-Chêne
Gros-Chêne
20 9 2022 Deep
Underground
Rennes
(Maurepas)
Henri Fréville
Henri Fréville
15 3 2002 Underground Rennes
(Italie)
Italie
Italie
15 3 2002 Underground Rennes
(Italie)
Jacques Cartier
Jacques Cartier
15 3 2002 Deep
Underground
Rennes
(Villeneuve)
Joliot-Curie - Chateaubriand
Joliot-Curie - Chateaubriand
20 9 2022 Underground Rennes
(Longs-Champs, Jeanne d'Arc)
J.F. Kennedy
J.F. Kennedy
15 3 2002 Underground Rennes
(Villejean)
Jules Ferry
Jules Ferry
20 9 2022 Deep
Underground
Rennes
(Fougères - Sévigné)
La Courrouze
La Courrouze
20 9 2022 Underground Saint-Jacques-de-la-Lande
(La Courrouze)
La Poterie
15 3 2002 Overground Rennes
(Poterie)
Le Blosne
Le Blosne
15 3 2002 Underground Rennes
(Torigné)
Les Gayeulles
Les Gayeulles
20 9 2022 Underground Rennes
(Maurepas)
Mabilais
Mabilais
20 9 2022 Deep
Underground
Rennes
(Arsenal-Redon)
Pontchaillou
Pontchaillou
15 3 2002 Overground Rennes
(Villejean)
République
République
15 3 2002 Deep
Underground
Rennes
(Centre-ville)
Saint-Germain
Saint-Germain
20 9 2022 Deep
Underground
Rennes
(Centre-ville)
Saint-Jacques - Gaîté
Saint-Jacques - Gaîté
20 9 2022 Underground Saint-Jacques-de-la-Lande
(La Courrouze)
Sainte-Anne
Sainte-Anne
 : 15 3 2002
 : 20 9 2022
Deep
Underground
Rennes
(Centre-ville)
Triangle
Triangle
15 3 2002 Underground Rennes
(Torigné)
Villejean - Université
Villejean - Université
15 3 2002 Underground Rennes
(Villejean)

Line A

Station Line(s) Inauguration Situation District
J.F. Kennedy (a) 15 march 2002 Underground Rennes

(Villejean)

Villjean-Université (a) 15 march 2002 Underground Rennes

(Villejean)

Pontchaillou (a) 15 march 2002 Overground Rennes

(Villejean)

Anatole France (a) 15 march 2002 Deep Underground Rennes

(La Touche)

Sainte-Anne (a)(b) 15 march 2002 Deep Underground Rennes

(Centre-ville)

République (a) 15 march 2002 Deep Underground Rennes

(Centre-ville)

Charles de Gaulle (a) 15 march 2002 Deep Underground Rennes

(Colombier - Champ-de-Mars)

Gares (a)(b) (TER)(TGV) 15 march 2002 Deep Underground Rennes

(Saint-Hélier)

Jacques Cartier (a) 15 march 2002 Deep Underground Rennes

(Villeneuve)

Clemenceau (a) 15 march 2002 Underground Rennes

(La Binquenais)

Henri Fréville (a) 15 march 2002 Underground Rennes

(Italie)

Italie (a) 15 march 2002 Underground Rennes

(Italie)

Triangle (a) 15 march 2002 Underground Rennes

(Torigné)

Le Blosne (a) 15 march 2002 Underground Rennes

(Torigné)

La Poterie (a) 15 march 2002 Overground Rennes

(Poterie)

Rennes metro line A map.

Opened on 15 March 2002, Line A is based on the Siemens VAL (véhicule automatique léger or light automatic vehicle) technology. The 9.4-kilometre (5.8 mi) Line A runs roughly northwest to southeast from J.F. Kennedy to La Poterie via Gare de Rennes (served by Gares metro station), with fifteen stations (thirteen of which are underground).

Services run between 05:20 and 00:40 each day (except Thursday, Friday and Saturday between 05:20 and 01:35), and with a waiting time of approximately 80 seconds between trains. From end to end, it takes around 16 minutes, with an average train speed of 32 km/h (20 mph). All stations are equipped with platform screen doors and lifts.

The system has 30 trains, each weighing 28 tonnes (27.6 long tons; 30.9 short tons) and 26 metres (85 ft 3+58 in) long, with a capacity of 170 passengers.

In January 2005, three park-and-ride lots were set up, offering 900 places to motorists. Two more opened in 2006–2007, able to accommodate an additional 700 vehicles.

On 1 March 2006, a card called KorriGo was created as a supplement to the ticket system to improve the metro traffic and the city's bus network.

The line is maintained by Service des Transports en Commun de l'Agglomération Rennaise (STAR), and managed by Keolis. It has a staff of approximately 100. It is operated from a control centre (poste de commande centralisée) situated in Chantepie. 120 cameras monitor the stations.

The station at La Poterie and viaducts on the line were designed by Foster + Partners.

With a population of just 205,000 inhabitants for city proper (in 2002), Rennes was the smallest city in the world to boast a metro until 2008 (when Lausanne Metro opened). However in 2013, 425,000 people (211 000 in Rennes) are served by the network in 43 municipalities. On average, there are 135,000 metro trips each day; this figure is expected to rise to 180,000 in coming years, leading to possible gridlock during the rush hours.

Stations

The station names have been chosen for the nearest existing streets or for points of interest near the station locations.

Station signage is in French and Gallo at Charles de Gaulle station and French and Breton at Gares station.

Gallery

Line B

Rennes metro line B map.
Viaduct of line B.

Opened on 20 September 2022, Line B is based on the new NeoVal technology. The line runs 13.4 kilometres (8.3 mi) north-east to south-west between Cesson - Viasilva and Saint-Jacques - Gaîté with 15 stations (12 of which underground). The line is interchangeable with Line A at two stations, Sainte-Anne and Gare, and other two stations, Saint-Germain and Colombier, are within walking distance to Line A.

The two terminal stations, Saint-Jacques - Gaîté and Cesson - Viasilva, as well as Les Gayeulles are served by the Parc relais (ride-and-park service) operated by STAR.

The north-eastern end of the line is served via a viaduct nearly 2.4 kilometres (1.5 mi) long. The viaduct is held up by 70 piers, with its average height between the bottom of its deck and the ground 6 to 7 metres (19 ft 8 in to 23 ft 0 in), and the tallest pier 9.35 metres (30 ft 8 in) tall.[7] The viaduct serves three stations: Cesson - Viasilva, Atlante, and Beaulieu - Université. At the end of the viaduct on the "Beaulieu - Université" station side, the line goes underground via an opening on the ground next to the parking lots of the university residence.

With the new line about to be open, the operator of Rennes' public transport system, Service des Transports en Commun de l'Agglomération Rennaise (STAR) have announced changes for the bus network,[8] scheduled to take effect on 24 October, a month after the opening of Line B. In addition, the bus line C3, currently having the same shade of green as the future Line B, will change its colour to yellow.

To promote the newly opening line, STAR announced that the entire Line B will be free on the first week of its operation, until Sunday 25 September. In addition, there will also be various celebration activities held at 5 stations: Saint-Jacques - Gaîté, La Courrouze, Cleunay, Gros-Chêne, and Cesson - Viasilva, as well as exhibitions of the new metro at Sainte-Anne station.[9]

On the day of opening, both lines of the metro network saw record-breaking daily ridership, with 155,000 riderships on Line A and 120,000 riderships on Line B, and an estimated 10% of the riderships transferring between the two lines. The two transfer stations, "Sainte-Anne" and "Gares", also saw the highest daily ridership of 23,000 and 15,000. The operator STAR have expected a daily ridership of 110,000 in the long term.[10]

Stations

See also

References

  1. ^ "Documentation technique du VAL 206 [dont le VAL 208 en est l'évolution]" (PDF). traction-electrique.ch (in French). Retrieved 7 February 2023.
  2. ^ "Metro of Rennes". mapa-metro.com. Retrieved 12 November 2023.
  3. ^ "À Rennes, une hausse de 20 % de la fréquentation des transports en commun depuis la ligne de métro B". Ouest France. Retrieved 12 November 2023.
  4. ^ "La date de la mise en service de la ligne b dévoilée !". metro-rennes-metropole.fr (in French). Retrieved 2022-07-18.
  5. ^ Laurent Fouillé (18 October 2012). "« Comment s'évalue un « bon TCSP » ? Demande à celui qui l'a fait ! » Le VAL de Rennes et son évaluation". rge.revues.org. Revue Géographique de l'Est. Retrieved 12 October 2016..
  6. ^ "La ligne B du métro de Rennes entrera bien en service le 20 septembre". letelegramme.fr. 24 August 2022. Retrieved 27 August 2022.
  7. ^ "Plaquette Viaduc Aout 2017" (PDF). metro-rennes-metropole.fr (in French). Retrieved 2022-07-18.
  8. ^ "Avant/Après : l'évolution du réseau". star2022.fr (in French). Retrieved 2022-08-06.
  9. ^ "Bienvenue sur la ligne b !". star2022.fr (in French). Retrieved 2022-09-16.
  10. ^ "Rennes. Avec 120 000 voyages, la fréquentation de la ligne B du métro atteint déjà des sommets". ouest-france.fr (in French). 2022-09-21.

External links

This page was last edited on 16 March 2024, at 23:05
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.