To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Regional Rail Revival

From Wikipedia, the free encyclopedia

Regional Rail Revival
LocationVictoria, Australia
ProposerGovernment of Victoria
StatusUnder Construction
TypeRailway upgrade
Cost estimate$1.8 billion
Start dateOctober 2017
Completion dateLate 2021
StakeholdersGovernment of Australia (major funding partner)
Government of Victoria (minor funding partner)
V/Line (operator)

The Regional Rail Revival is a joint initiative between the Australian federal government and the Victorian state government to upgrade all regional railway lines in Victoria. The project has an estimated total cost of A$4 billion.[1] A$2.3 billion of the project's total cost is being funded by the Australian Government.[2] It is being delivered by Rail Projects Victoria (RPV). The project is guided by the 2016 Regional Network Development Plan, which outlines the short, medium and long-term priorities for a modernised regional rail network.[3]

YouTube Encyclopedic

  • 1/2
    Views:
    1 808
    5 796
  • Regional Rail Link Explained - V/Line Transporting Victoria Episode 5
  • Geelong Fast Rail Explained

Transcription

Projects

Regional Rail Revival is made up of multiple projects:[4]

  • Ararat Stabling
  • Ballarat Line Upgrade (completed early 2021)[5]
    • track duplication between Deer Park West and Melton (length of 18 kilometres (11 mi)), and at Bacchus Marsh
    • new Cobblebank station between Rockbank and Melton
    • reconstruction of Rockbank Station
    • upgrades to Bacchus Marsh, Ballan and Wendouree stations, including new platforms
    • new train stabling facility at Maddingley
    • passing loops at Ballan and Millbrook
    • signal and track upgrades
  • Bendigo and Echuca Line Upgrade[6]
    • modernised electronic train order (ETO) system from Bendigo to Swan Hill and Echuca
    • upgrades to ten level crossings between Eaglehawk and Bendigo with improved train detection technology
    • track upgrades on the Echuca Line, which will increase the maximum train speed on the line.
    • new stations at Huntly, Goornong, and Raywood. Goornong and Raywood stations were previously closed in 1979 and 1981 respectively.
    • potential reopening of Harcourt railway station (planning)
  • Donnybrook upgrade (completed August 2020)
    • 150 new car parking spaces
    • New platform shelters
    • Improved pedestrian access
    • Improved security with addition CCTV and new platform lighting
    • An extension of the city-bound platform
  • Geelong Line Upgrade[7]
    • track duplication between South Geelong and Waurn Ponds
    • upgrades to South Geelong, Marshall and Waurn Ponds stations
    • new train maintenance and stabling facility at Waurn Ponds
    • level crossing removals
    • Armstrong Creek corridor extension (planning)
  • Gippsland Line Upgrade[8]
    • new rail bridge over the Avon River in Stratford (completed)
    • upgrades to Bunyip, Longwarry, Morwell and Traralgon stations, including new platforms
    • track duplication at Bunyip and Longwarry
    • extension of the Morwell crossing loop
    • level crossing and signalling upgrades
    • drainage structure upgrades
  • Murray Basin Rail Project
  • North-East Line Upgrade (completed December 2020)
  • Shepparton Line Upgrade
  • Wallan station upgrade (completed August 2020)
    • An extension of the existing waiting room
    • New toilets in the waiting room
    • New platform shelters
    • Two new bus bays with shelters
    • Improved security with addition CCTV and new platform lighting
    • Additional bicycle parking
    • An extension of the city-bound platform
  • Warrnambool Line Upgrade (Stage 1)[9]
    • upgrades to 12 level crossings with improved train detection technology (completed)
    • signalling upgrades
    • new crossing loop at Boorcan
  • Warrnambool Line Upgrade (Stage 2)
    • upgrades to more than 50 level crossings with improved train detection technology
    • stabling upgrade at Warrnambool station
    • introduction of VLocity trains on the line for the first time

Construction

Timeline

New Avon River rail bridge in April 2021.

See also

References

  1. ^ "Regional Rail Revival Package". Department of Infrastructure, Transport, Regional Development and Communications. Archived from the original on 19 January 2022. Retrieved 3 February 2022.
  2. ^ "Agreements on Inland Rail and Regional Rail Revival reached between Australian and Victorian governments". Urbanalyst. 19 March 2018. Archived from the original on 24 October 2020. Retrieved 5 May 2020.
  3. ^ "Regional Network Development Plan". Archived from the original on 27 March 2020. Retrieved 5 May 2020.
  4. ^ "Regional Rail Revival". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 3 February 2022. Retrieved 3 February 2022.
  5. ^ "Ballarat Line Upgrade". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 3 February 2022. Retrieved 3 February 2022.
  6. ^ "Bendigo and Echuca Line Upgrade". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 2 April 2022. Retrieved 3 February 2022.
  7. ^ "Geelong Line Upgrade". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 3 February 2022. Retrieved 3 February 2022.
  8. ^ "Gippsland Line Upgrade". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 3 February 2022. Retrieved 3 February 2022.
  9. ^ "Warrnambool Line Upgrade". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 14 May 2023. Retrieved 3 February 2022.
  10. ^ "Work Kicks Off On The Ballarat Line Upgrade". Archived from the original on 12 April 2020. Retrieved 5 May 2020.
  11. ^ "New Train Station For Melbourne's Growing West". Archived from the original on 12 April 2020. Retrieved 5 May 2020.
  12. ^ "Ballarat Line Upgrade Bringing Extra Benefits For Locals". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
  13. ^ "Half A Billion Dollar Gippsland Line Upgrade Kicks Off". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
  14. ^ "Ballan Station upgrade plans unveiled". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
  15. ^ "Shepparton Station Stabling Construction Underway". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
  16. ^ "Construction underway at Donnybrook and Wallan stations". Archived from the original on 11 April 2020. Retrieved 20 May 2020.
  17. ^ "Ballarat Line Upgrade to hit one million hours". Archived from the original on 11 April 2020. Retrieved 20 May 2020.
  18. ^ "New And Improved Rockbank Station". Retrieved 20 May 2020.
  19. ^ "Construction underway on the new Avon River bridge". Archived from the original on 11 April 2020. Retrieved 20 May 2020.
  20. ^ "Victoria's Newest Station Opens At Cobblebank". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
  21. ^ "Construction starts on Ararat stabling upgrade". Archived from the original on 11 April 2020. Retrieved 20 May 2020.
  22. ^ "Construction underway on Warrnambool Line level crossing upgrades". Archived from the original on 20 April 2020. Retrieved 20 May 2020.
  23. ^ "Donnybrook Station upgrade complete". Archived from the original on 6 August 2020. Retrieved 20 May 2020.
  24. ^ "Improved safety on the Warrnambool Line". Archived from the original on 6 August 2020. Retrieved 20 May 2020.
  25. ^ "Station Construction Fast-Tracked As Consultation Begins". Archived from the original on 30 March 2021. Retrieved 7 August 2020.
  26. ^ "Bendigo and Echuca Line Upgrade – Goornong Station". Victoria's Big Build – Regional Rail Revivial. Archived from the original on 4 March 2022. Retrieved 3 February 2022.
  27. ^ "Now arriving at Waurn Ponds Station". Victoria's Big Build - Regional Rail Revival. Retrieved 22 March 2024.
  28. ^ a b "Timetable changes on the Echuca and Swan Hill lines". Public Transport Victoria. Archived from the original on 16 July 2022. Retrieved 16 July 2022.
  29. ^ "Upgrading the Gippsland Line for the future". Victoria's Big Build - Regional Rail Revival. Retrieved 22 March 2024.
  30. ^ "More Trains For Booming Geelong Communities". Premier of Victoria. Retrieved 22 March 2024.

External links

This page was last edited on 22 March 2024, at 13:14
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.