To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Réunion Tram Train

From Wikipedia, the free encyclopedia

Map of the planned route

The Réunion Tram Train (French: Tram-train de la Réunion) was a planned tram-train line to run approximately 140 kilometres along the coast of Réunion.[1] Construction of the first phase was scheduled to start in 2010, for opening in 2013.[2][3] The Tram'Tiss consortium was preferred bidder for a PPP concession to develop the line.[3] However, the project was abandoned in May 2010 due to a lack of funds.[4]

History

Reunion used to have a rail system opened in the 1890s and closed in the 1950s and 1960s when population and traffic congestion were less.[5]

Overview

The line would have operated as a hybrid of a tram and a train, with tram-like street-level stations in the towns and train-like speeds of up to 100 km/h on dedicated right of way between them. Trains would have been capable of carrying up to 250 passengers; the route would have also been capable of carrying freight from the port.

From west to north, the projected route of the first phase (41.5 km, 26 stations) will start from St-Paul and pass through St-Denis, terminating at Roland Garros Airport in Ste-Marie. The mountainous topography of Réunion would have required a large number of viaducts and tunnels: the first phase includes 11 major engineering structures, including a 10-kilometre tunnel and the highest railway bridge in the world. The cost was estimated to be €1.25 billion for the first phase alone. Extensions east to St-Benoît and south to St-Joseph were planned.[1][3]

Future plans

In 2019 a light rail system was proposed to link Le Barachois with the airport.[6]

See also

References

  1. ^ a b "Toute La Réunion est concernée" (PDF). Ma région et moi (in French). August 2009. p. 24. Archived from the original (pdf) on September 20, 2009. Retrieved November 25, 2009.
  2. ^ "Le calendrier de projet" (PDF). Ma région et moi (in French). August 2009. p. 5. Archived from the original (pdf) on September 20, 2009. Retrieved November 25, 2009.
  3. ^ a b c "La Réunion picks tram-train concessionaire". Railway Gazette International. 2009-08-18. Archived from the original on 2009-11-21.
  4. ^ http://www.projectfinancemagazine.com/Article/2476763/Reunion-Tram-Train-cancelled.html
  5. ^ Micenko, Peter (2004). "Rail returns to reunion". International Railway Journal.
  6. ^ "Consultation begins on Réunion tram project". International Railway Journal. 27 August 2019. Retrieved 27 August 2019.

External links


This page was last edited on 12 January 2024, at 01:52
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.