To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

President Street Power Station, Johannesburg

From Wikipedia, the free encyclopedia

President Street Power Station, Johannesburg was an early 20th-century power station in Johannesburg, South Africa.

When the President Street Power Station was constructed, supply tenders were invited. Although the cheapest was for a steam driven plant, consultants recommended a gas engine scheme which promised sufficient savings in fuel consumption to recover the increased capital cost within a few years.

The estimated power needed by Johannesburg, almost 10 MW, required gas engines bigger than any previously built. Mordey & Dawbarn, the consulting engineers, recommended the following supplies, which were adopted by the municipality:

  1. 500/600 volts DC (negative earthed) for the Johannesburg tramways.
  2. 460/520 volts DC for a 230+230 volt 3 wire distribution with earthed centre to provide power and light for the city centre.
  3. 3,000 volt 2-phase 50 Hz AC for transmitting power to outlying districts and to supply motor converters for distant DC tramway feeds.

Stewart and Company, the Scottish contractors, supplied untested and experimental engines. There had been a history of costly failure of gas engines in the UK linked to the problem of breakdowns caused by the impurities in bituminous coal. Apparently no one had checked before starting on the scheme whether the bituminous coal to be used in the gas producers was suitable for the installation. Within months the engines ran into serious problems. New engines and producer plant proved unreliable and expensive to operate and there were heavy maintenance costs.

An explosion in the boiler house in March 1907 led to the entire installation being shut down in May 1907. By mid-1907 the city council rejected the whole scheme and instituted legal proceedings against the suppliers to recover their losses.

See also

References

  • J Shorten, The Johannesburg Saga, ‘The City Electricity Department,’ page 599 ff.

This page was last edited on 14 January 2023, at 16:30
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.