To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Panki Thermal Power Station

From Wikipedia, the free encyclopedia

Panki Thermal Power Station is located at Panki in Kanpur Uttar Pradesh. Its first stage was commissioned in 1967 by the then Prime Minister, Indira Gandhi.[1] It has an installed capacity of 660 Mega Watts. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan Nigam. It has a 275 Metres high chimney which is one of the tallest structures in India

YouTube Encyclopedic

  • 1/5
    Views:
    4 056
    371
    11 418
    303
    4 096
  • 🔥🔥UPRVUNL Employees colony//Anpara Thermal Power plant tour//ANPARA SONEBHADRA UP// Biblyshu.🔥🔥
  • HARDUAGANJ THERMAL POWER STATION .
  • How electricity is generated? || Thermal power plant || What's inside the power plant ?|| Hindi
  • Panki power house ek Chhota sa travel vlog ( kanpur ) rohit vlogs
  • Obra C Thermal Power Extension Project | DOOSAN | UPRVUNL | Priytosh

Transcription

Operations

The plant has been set up in three stages. The stage had two units of 32 megawatts each and it began operation in 1967 both the units ceased operations in 1998. The second stage had two units of 110 megawatts each and began operation in 1977. The machinery for the second stage was from Bharat Heavy Electricals Limited. The second stage ceased operations in 2018 and a third stage was planned. The Third Stage is under construction, it will have 1 unit of 660 Mega Watts, its foundation stone was laid by Prime Minister Narendra Modi in 2019,[2] and it will begin operation by December 2022. The coal to all these units is fed from coal mines of Bharat Coking Coal Limited, Eastern Coalfields Limited by means of Railways.

Installed Capacity (MW) Date of Commissioning Status
32 1967 Ceased Operation in 1998
32 1968 Ceased Operation in 1998
110 1977 January Ceased Operation in 2018[3]
110 1977 May Ceased Operation in 2018
660 2022 Dec Under Construction[4]

Future expansion

The state government decided in July 2014 to build a unit of 660 Mega Watts to the power plant.[5] A contract was issued by UPRVUNL to BHEL on EPC basis for construction of 1x660 MW units at Panki on 31 March 2018, with scheduled project completion in December 2022.[6]

See also

References

  1. ^ "Panki power plant ceases operation". The Times of India. 11 January 2018. Retrieved 4 January 2021.
  2. ^ www.ETEnergyworld.com. "Modi lays foundation of 660 MW Panki power plant - ET EnergyWorld". ETEnergyworld.com. Retrieved 4 January 2021.
  3. ^ "Uprvunl". Archived from the original on 13 June 2010. Retrieved 9 November 2008.
  4. ^ "BHEL wins Rs.4,400 Crore order for 1x660 MW Supercritical Power Plant in UP". 2 April 2018.
  5. ^ Rawat, Virendra Singh (22 July 2014). "Akhilesh cabinet okays 3 thermal power units totalling 1,980 mw". Business Standard India.
  6. ^ "BHEL bags Rs 4400 cr contract from Uttar Pradesh". The Economic Times.

26°28′37″N 80°14′28″E / 26.477046°N 80.24104°E / 26.477046; 80.24104


This page was last edited on 28 February 2023, at 13:18
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.