To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Operations and Checkout Building

From Wikipedia, the free encyclopedia

Operations and Checkout Building
Operations and Checkout Bldg.jpg
Aerial view of the Operations and Checkout building at KSC, c. 2017
LocationBrevard County, Florida, USA
Nearest cityTitusville, Florida
Coordinates28°31′26″N 80°38′46″W / 28.52389°N 80.64611°W / 28.52389; -80.64611
Built1964
ArchitectCharles Luckman
Architectural styleInternational
VisitationOpen, requires sponsorship by NASA employee
MPSJohn F. Kennedy Space Center MPS
NRHP reference No.99001636[1]
Added to NRHPJanuary 21, 2000

The Neil Armstrong Operations and Checkout Building (O&C)[2] (previously known as the Manned Spacecraft Operations Building) is a historic building on Merritt Island, Florida, United States. The five-story structure is in the Industrial Area of NASA's Kennedy Space Center. Its has twin-block facilities that include the crew quarter dormitories for astronauts, suit-up preparations prior to their flights, and the other is a large spacecraft workshop used for manufacturing and checking activities on crewed spacecraft. On January 21, 2000, it was added to the U.S. National Register of Historic Places.

Apollo program

When it was originally built in 1964 to process spacecraft in the Gemini and Apollo era, it was known as the Manned Spacecraft Operations Building. It was renamed the Operations and Checkout Building during the Shuttle program, known informally as the O&C.

Altitude test chambers

The Apollo 1 crew, Gus Grissom, Ed White and Roger Chaffee, enter their spacecraft for a test in the O&C altitude chamber on October 18, 1966.
The Apollo 1 crew, Gus Grissom, Ed White and Roger Chaffee, enter their spacecraft for a test in the O&C altitude chamber on October 18, 1966.

In 1965, a pair of altitude chambers were installed in the High Bay for testing the environmental and life support systems of both the Apollo Command/Service Module and Lunar Module at simulated altitudes of up to 250,000 feet (76 km). Each chamber is 58 feet (18 m) high (with a clear working height of 28 feet (8.5 m)) and an interior diameter of 33 feet (10 m),[3] were human-rated, and capable of reaching the maximum altitude (minimum pressure) in one hour. These were used by the prime and backup crews of all crewed missions, from the ill-fated Apollo 1 in October 1966, through to the Apollo-Soyuz Test Project in July 1975.[4]

Post-Apollo use

During the 1980s and 90s the O&C building was used to house and test Spacelab science modules before their flights aboard the Space Shuttle.

In the late 1990s and 2000s, some modules and trusses for the International Space Station were checked out in the building.

On January 30, 2007, NASA held a ceremony to mark the transition of the building's high bay for use by the Constellation program. The building would serve as the final assembly facility for the Orion crew exploration vehicle.[5] In preparation for the transition, the state of Florida provided funds to clear the facility of about 50 short tons (45 metric tons) of steel stands, structures and equipment.[6] Renovations totaling $55 million took place from June 2007 through January 2009,[7] at which point Lockheed Martin became the operator of the facility for Orion production.[8] The Orion spacecraft for Artemis 1 completed its assembly in this location and was moved to the Multi-Payload Processing Facility on January 16, 2021.[9] The Crew Module of the Orion spacecraft for Artemis 2 is under assembly in the building's high bay as of August 28, 2021.[10]

The building was renamed to the Neil Armstrong Operations and Checkout Building in a ceremony on the 45th anniversary of Apollo 11 (2014).[11]

Gallery

Notes

  1. ^ "National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
  2. ^ https://images.nasa.gov/details-s26-s-029
  3. ^ Craig
  4. ^ Slovinac, pp. 1-2
  5. ^ Young
  6. ^ Marconi, p. 2
  7. ^ "Operations and Checkout Building High Bay Ready for Orion Processing". NASA. February 4, 2009. Retrieved 5 November 2015.
  8. ^ "KENNEDY SPACE CENTER'S ANNUAL REPORT FY2008" (PDF). NASA's Kennedy Space Center. Retrieved 5 November 2015.
  9. ^ "Artemis I Orion Moves For Fueling, Next Step in Launch Preparations". NASA. January 16, 2021. Retrieved 28 August 2021.
  10. ^ "Cabin Checks Underway to Keep Crew Breathing Easy on Artemis II". February 12, 2021. Retrieved 28 August 2021.
  11. ^ Dean, James (July 22, 2014). "Neil Armstrong Legacy Adds Honor". Florida Today. Cocoa, Florida. p. A1 – via Newspapers.com.

References

External links

This page was last edited on 29 August 2021, at 02:55
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.