To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

O'Keefe Rail Trail

From Wikipedia, the free encyclopedia

The O'Keefe Rail Trail is a 50-kilometre (31 mi) rail trail connecting Bendigo with Heathcote. The sandy gravel trail runs along a former branch line on the Melbourne-Sydney rail line. It previously ran 17 km (11 mi) from Bendigo to Axedale but works completed in 2015 extended the route to Heathcote [1]

The trail includes a number of bridges, including the $50,000 Axe Creek Suspension Bridge, which was built in 1993. In early 2014 a pedestrian/cycle bridge was built over the Campaspe River at Axedale.

The trail also includes a tunnel that crosses under the McIvor Highway at Axedale. This was constructed as part of the Campaspe River crossing project in 2014.

The trail is named after Andrew O'Keefe, an early railway pioneer.

O'Keefe Rail Trail in Junortoun

YouTube Encyclopedic

  • 1/3
    Views:
    10 032
    455
    1 136
  • Experience the O'Keefe Rail Trail
  • Cycling O'Keefe Rail Trail 2014
  • Cycling Bass Coast Rail Trail 2017

Transcription

History

The Heathcote to North Bendigo line was built by O'Keefe in 1888 after successfully tendering 88,409 pounds to build the 28 miles (45 km) of track and 50 bridges. It formed part of the Wandong to Bendigo line, and was commissioned as part of the Railway Construction Act 821, which authorised large amounts of railway infrastructure to be built. At the time, Heathcote had a population of 1500, and was part of the supply chain for the gold rush.

From 1888 for several decades, the railway was kept busy supplying timber for mine shafts, and as fuel. At its peak, two trainloads of timber was transported each day. However, by 1958, this had dwindled to less than a trainload of freight per week, and the service was suspended.

The track was finally dismantled in the 1970s.

Map of the rail trail, as at September 2013.

References

External links

Sources


This page was last edited on 7 May 2023, at 18:49
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.