To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Nocatee Parkway

From Wikipedia, the free encyclopedia

County Road 210 marker

County Road 210

Nocatee Parkway
Map
Route information
Length4.83 mi (7.77 km)
ExistedJanuary 2008–present
Major junctions
West end US 1 near Jacksonville
East endDavis Park Road in Nocatee
Location
CountryUnited States
StateFlorida
CountiesDuval, St. Johns
Highway system

Nocatee Parkway is a 4.83-mile (7.77 km) freeway in the southeasternmost point in Jacksonville, in the community of Nocatee, and in the counties of Duval and St. Johns. The road provides easy access to Jacksonville, Interstate 95 (I-95) and State Route 9B (Future I-795) for residents of Nocatee and elsewhere. The parkway is also critical for hurricane evacuation route for Beaches-area residents.[1][2] The entire parkway is part of County Road 210 (CR 210).

Route description

The route begins at U.S. Route 1 (US 1), with short stub roads near the exit and entrance points. The parkway travels in an east to northeastward direction from US 1, with a partial cloverleaf interchange at Valley Ridge Road followed by a single-point urban interchange at Crosswater Parkway. Finally, the parkway has an intersection with Davis Park Road, ending the freeway, and becoming Palm Valley Road.

History

The construction of this parkway began in January 2008, with a cost of $150 million. The construction included clearing and grubbing, storm drainage, construction of single and double barrel box culverts, the construction of 8 bridges, transmission/distribution utility installations, drilled shaft construction, MSE wall, installation of concrete curb, sidewalk, medians, signalization, striping, and sodding.[3] In October 2010, the parkway was completed, a decade ahead of schedule.[4]

Exit list

All exits are unnumbered.

CountyLocationmikmDestinationsNotes
St. JohnsNocatee0.00.0 US 1 – Jacksonville, St. AugustineWestern terminus of County Road 210 and Nocatee Parkway
DuvalJacksonville1.582.54Valley Ridge Road
St. JohnsNocatee3.014.84Crosswater Parkway
4.837.77Davis Park RoadEastern terminus of Nocatee Parkway, County Road 210 continues as Palm Valley Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Route transition

References

  1. ^ "County Road 210 / Nocatee Parkway West". Retrieved January 27, 2019.
  2. ^ "Nocatee Parkway". Retrieved January 27, 2019.
  3. ^ "NOCATEE PARKWAY". Retrieved January 27, 2019.
  4. ^ "Nocatee Parkway opens to westbound traffic". October 23, 2010. Retrieved January 27, 2019.

External links

KML is not from Wikidata
This page was last edited on 19 January 2020, at 15:27
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.